EUVIMED · CrossrefZeitschrift
International Journal of Industrialized Construction
ISSN 2563-5034 · University of Alberta Libraries
Neueste Artikel
Planning Governance in MMC Based Public Infrastructure Projects
Safer, Faster, Greener, Better & Lower Cost: Integrated Project Delivery Creates Good Conditions for Modular Offsite Construction
Lean Human–Robot Integration for Panelized MEP Assembly in Modular Construction
Panelized Wood Construction Quality Control in Real-Time: An Intelligent Framework
Designing an Integrative and Ubiquitous Lean Culture: A Cartographic Exploration of Sustainable Project Discourses
Use of Advanced Digital Methodologies for the Analysis of Complex Systems: HBIM for the Development of Cognitive/Energy‑Responsive Digital Twins
Multi-Criteria Selection of Buffer Strategies for Resilient Modular Construction Supply Chains: An AHP-Based Framework for Tangier, Morocco’s Port-Connected Environments
An Automated Construction Learning Factory: Driving Digital Design, Additive Manufacturing, and Robotic Assembly with IFC
Policy and Regulatory Barriers and Mitigation Strategies for Modular Offsite Construction (MOC) Adoption
Life-Cycle Operation & Maintenance Planning through Last Planner Approach and Digital Twins
Improving Information Flow in Building Energy Audits: A Lean Analysis of Structured Mobile Data Capture
Protective Coating Strategies for Additively Manufactured Steel Components in Modular and Offsite Construction
Overview of the Characteristics of the Modular Industry and Barriers to its Increased Market Share
Towards Dynamic Vertical Urbanism
Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study
Planning semi-automated precast production using GA
Development of Automated Top-Down Construction System for Low-rise Building Structures
Feasibility and Implications of the Modular Construction Approach for Rapid Post-Disaster Recovery
Integrating machine learning with QFD for selecting functional requirements in construction automation
Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case
Construction stakeholders’ perceived benefits and barriers for environment-friendly modular construction in a hospitality centric environment
Using 3D Scanning for Accurate Estimation of Termination Points for Dimensional Quality Assurance in Pipe Spool Fabrication
A Multidimensional Framework for Construction Worker Well Being: Implications for Off-Site Construction Transitions
Economic and Financial Implications of Shifting from Onsite to Off Site Construction: Evidence from Industry Stakeholders
EUVIMED