EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Economic and Financial Implications of Shifting from Onsite to Off Site Construction: Evidence from Industry Stakeholders

Tadesse Zelele, Xue Chen, Mohamed Assaf, Sena Assaf, Mohammad Elahi, Deyaaldeen Alnakdali, Aryan Hojjati, Joon Hwang, Sang Jun Ahn, Ahmed Bouferguene, Mohamed Al-Hussein, Osama Moselhi

International Journal of Industrialized Construction · 2026

DOI: 10.29173/ijic349 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Industrialized Construction, 2026. Verfasst von Tadesse Zelele und 11 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Off-site construction (OSC) is associated with potential improvements in cost efficiency and schedule performance, but its adoption outcomes and stakeholder perceptions remain under-evaluated. This study examines stakeholder perceptions of the economic and financial impacts of OSC transition using survey evidence from Edmonton, Canada. An 8-question structured questionnaire was administered in person to OSC stakeholders representing different firm sizes and annual OSC delivery volumes. The survey captured perceptions of (i) overall project cost impact, (ii) affected cost components, (iii) economic/financial drivers, (iv) cash-flow restructuring, and (v) financing period changes. Data were analyzed using descriptive statistics and cross-tabulation (including comparisons by annual OSC project volume as a proxy for OSC maturity/experience). Results show heterogeneous perceptions of overall cost impact: respondents reported expected cost decreases, cost increases, and uncertainty. Material, labor, and site management costs were identified as the most affected cost components. Shorter project schedules were the most frequently selected economic driver, followed by reduced waste/rework, improved quality, and greater cost certainty. In contrast, cash-flow and financing-period impacts were perceived less consistently, with high uncertainty among lower-volume firms. Higher-volume firms more often identified larger early-stage expenditures as a key cash-flow shift. The findings provide perception-based evidence on economic and financial barriers/enablers of OSC transition and support the need for clearer cost and financing benchmarks to accelerate adoption.

Zitieren

APA

Zelele, T., Chen, X., Assaf, M., Assaf, S., Elahi, M., Alnakdali, D., Hojjati, A., Hwang, J., Ahn, S. J., Bouferguene, A., Al-Hussein, M., & Moselhi, O. (2026). Economic and Financial Implications of Shifting from Onsite to Off Site Construction: Evidence from Industry Stakeholders. International Journal of Industrialized Construction. https://doi.org/10.29173/ijic349

Vancouver

Zelele T, Chen X, Assaf M, Assaf S, Elahi M, Alnakdali D, et al. Economic and Financial Implications of Shifting from Onsite to Off Site Construction: Evidence from Industry Stakeholders. International Journal of Industrialized Construction. 2026. doi:10.29173/ijic349

BibTeX
@article{Zelele2026,
  author = {Zelele, Tadesse and Chen, Xue and Assaf, Mohamed and Assaf, Sena and Elahi, Mohammad and Alnakdali, Deyaaldeen and Hojjati, Aryan and Hwang, Joon and Ahn, Sang Jun and Bouferguene, Ahmed and Al-Hussein, Mohamed and Moselhi, Osama},
  title = {Economic and Financial Implications of Shifting from Onsite to Off Site Construction: Evidence from Industry Stakeholders},
  journal = {International Journal of Industrialized Construction},
  year = {2026},
  doi = {10.29173/ijic349}
}
Kostenlos starten →