Safer, Faster, Greener, Better & Lower Cost: Integrated Project Delivery Creates Good Conditions for Modular Offsite Construction
International Journal of Industrialized Construction · 08.05.2026 · 3 (1) · 7-13
DOI: 10.29173/ijic339 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Industrialized Construction, online erschienen am 08.05.2026. Verfasst von Alan Mossman. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).
Abstract (Originalsprache)
The purpose of this paper is to encourage construction customers (= public or private sector owners, clients, principals, employers), as well as those who deliver construction, to consider Integrated Project Delivery (IPD) or Project Alliancing (PA) to procure construction generally and particularly Modular Offsite Construction (MOC). MOC has the potential to be safer, faster, greener, better quality and lower cost [SFGQ$] than other methods, provided key criteria are met. IPD/PA can increase the chances that delivery teams deliver a SFGQ$ project. Most construction is procured using bilateral, adversarial and transactional contracts that assume that no party can be trusted, encourage each party to maximise their own profits from the project at the expense of others while creating significant inflexibility within the team. Delivering MOC requires close collaboration between designers, fabricators and constructors. Delivering complex projects requires team members able to work flexibly and quickly make changes to create what is best for the project. IPD/PA can be set up so that all the major parties on a project are aligned to support the customer’s intention – while they all become advocates for the project. IPD/PA creates relationships among and between multiple parties as the basis for designing and delivering a project when little is known about the project detail at the outset – these are relational rather than transactional agreements. IPD/PA enable designers and constructors to work flexibly with the customer to create what the customer wants. This paper looks at critical governance and commercial arrangements that need considering for MOC to work for customers and particularly those in the public sector.
Zitieren
APA
Mossman, A. (2026). Safer, Faster, Greener, Better & Lower Cost: Integrated Project Delivery Creates Good Conditions for Modular Offsite Construction. International Journal of Industrialized Construction, 3(1), 7-13. https://doi.org/10.29173/ijic339
Vancouver
Mossman A. Safer, Faster, Greener, Better & Lower Cost: Integrated Project Delivery Creates Good Conditions for Modular Offsite Construction. International Journal of Industrialized Construction. 2026;3(1):7-13. doi:10.29173/ijic339
BibTeX
@article{Mossman2026,
author = {Mossman, Alan},
title = {Safer, Faster, Greener, Better & Lower Cost: Integrated Project Delivery Creates Good Conditions for Modular Offsite Construction},
journal = {International Journal of Industrialized Construction},
year = {2026},
volume = {3},
number = {1},
pages = {7--13},
doi = {10.29173/ijic339}
}
EUVIMED