Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case
International Journal of Industrialized Construction · 2021
DOI: 10.29173/ijic236 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Industrialized Construction, 2021. Verfasst von Rajarshi Ghimire und 4 weiteren Autor:innen. Die Arbeit wurde bisher 8-mal zitiert (Crossref) und nennt 70 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).
Abstract (Originalsprache)
The use of a 4D schedule as technological advancement has brought significant improvement to the planning and execution of construction projects, through visualizing step-wise construction progress, following a sequence of pre-planned activities, and finalizing a baseline schedule with necessary changes. Moreover, the application of immersive virtual reality (IVR) to create an interactive 4D BIM schedule of a planned structure has made it possible to create a detailed plan of any construction project. Because of these benefits, the use of 4D schedules and immersive virtual reality in the construction industry has increased, leading to improved planning and execution. However, past studies have given little attention to the applications of such technologies on modular projects. Thus, this research applied a 4D schedule, along with immersive virtual reality, on a modular project, and verified their benefits and effectiveness. The results showed that most of the participants who experienced a 4D BIM schedule, along with immersive virtual reality (4D/IVR), strongly agreed that it is an easy and straightforward way to visualize the project, understand the schedule, and find any errors. Moreover, while fewer than half of the participants scheduled the assembly sequence correctly with conventional schedule and 2D drawings, almost all of them sequenced the assembly successfully with 4D/IVR. Based on the findings, this research concludes that the implementation of a 4D BIM schedule, along with virtual reality technology, can enhance the fabrication and assembly performance of modules.
Zitieren
APA
Ghimire, R., Lee, S., Choi, J. O., Lee, J., & Lee, Y. (2021). Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case. International Journal of Industrialized Construction. https://doi.org/10.29173/ijic236
Vancouver
Ghimire R, Lee S, Choi JO, Lee J, Lee Y. Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case. International Journal of Industrialized Construction. 2021. doi:10.29173/ijic236
BibTeX
@article{Ghimire2021,
author = {Ghimire, Rajarshi and Lee, Seungtaek and Choi, Jin Ouk and Lee, Jin-Yeol and Lee, Yong-Cheol},
title = {Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case},
journal = {International Journal of Industrialized Construction},
year = {2021},
doi = {10.29173/ijic236}
}
EUVIMED