Case Study on the Operation of Overcurrent Protection in 22KV Distributed Generation at Houay Kapheu Hydropower Plant

Keooudone Inthavong, Khampha Sihanakhone

Lao Science Journal · 09.04.2026 · 3 (1) · 245-260

DOI: 10.71026/ls.2026.030119 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Lao Science Journal, online erschienen am 09.04.2026. Verfasst von Keooudone Inthavong und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The integration of Distributed Generation (DG), such as hydropower, into medium-voltage networks often disrupts conventional overcurrent protection schemes, leading to false tripping and reduced reliability. This study presents a practical investigation and optimization of the overcurrent protection system at the Houay Kapheu Hydropower Plant in Laos. Using ETAP software, the plant's network was modeled to perform load flow and short-circuit analyses. Simulation of the existing relay settings revealed significant miscoordination, with Coordination Time Intervals (CTI) below 0.1 seconds, causing non-selective tripping during faults. To address this, a systematic recalculation of relay parameters including pickup currents and Time Multiplier Settings (TMS) based on the IEC Standard Inverse characteristic was conducted. The proposed optimized settings were validated through simulation, demonstrating a perfectly graded tripping sequence with all CTIs exceeding 0.3 seconds. This successfully eliminated maloperations, ensuring selective fault isolation and maintaining system stability. This case study provides a validated, practical framework for enhancing protection coordination in similar DG-integrated rural power systems.

Zitieren

APA

Inthavong, K., & Sihanakhone, K. (2026). Case Study on the Operation of Overcurrent Protection in 22KV Distributed Generation at Houay Kapheu Hydropower Plant. Lao Science Journal, 3(1), 245-260. https://doi.org/10.71026/ls.2026.030119

Vancouver

Inthavong K, Sihanakhone K. Case Study on the Operation of Overcurrent Protection in 22KV Distributed Generation at Houay Kapheu Hydropower Plant. Lao Science Journal. 2026;3(1):245-260. doi:10.71026/ls.2026.030119

BibTeX
@article{Inthavong2026,
  author = {Inthavong, Keooudone and Sihanakhone, Khampha},
  title = {Case Study on the Operation of Overcurrent Protection in 22KV Distributed Generation at Houay Kapheu Hydropower Plant},
  journal = {Lao Science Journal},
  year = {2026},
  volume = {3},
  number = {1},
  pages = {245--260},
  doi = {10.71026/ls.2026.030119}
}
Kostenlos starten →