A Case Study on the Switching of Generator at Nammang3 Hydropower Plant
Lao Science Journal · 16.04.2026 · 3 (1) · 153-168
DOI: 10.71026/ls.2026.030112 ↗Kurz gefasst
Fachartikel in der Zeitschrift Lao Science Journal, online erschienen am 16.04.2026. Verfasst von Kongphang INTHAVONG und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Unexpected generator tripping during switching operations is a critical operational issue in hydropower plants, particularly during transformer energization. This study investigates the causes of generator trips at the Nam Mang3 Hydropower Plant that occurred when energizing a transformer of one generating unit while another unit remained in operation. The analysis reveals that transformer inrush current, combined with a common grounding system between generating units, allows transient current to flow into the protection zone of the operating generator. This condition causes the generator differential relay (87G) to misinterpret the transient current as an internal fault, resulting in false tripping. A detailed simulation study was conducted using ETAP software to analyze current behavior, relay response, and transient characteristics during switching events. Based on the simulation results, several mitigation measures are proposed, including adjustment of 87G relay settings, application of harmonic restraint and time delay, synchronization checking during energization, and separation of grounding systems. The study concludes that optimizing the 87G relay settings provides an effective and low-cost solution for preventing false trips while maintaining sufficient sensitivity to genuine internal faults. The proposed improvements significantly enhance the reliability and operational stability of the hydropower plant.
Zitieren
APA
INTHAVONG, K., & SOUDTHISOMBUTH, K. (2026). A Case Study on the Switching of Generator at Nammang3 Hydropower Plant. Lao Science Journal, 3(1), 153-168. https://doi.org/10.71026/ls.2026.030112
Vancouver
INTHAVONG K, SOUDTHISOMBUTH K. A Case Study on the Switching of Generator at Nammang3 Hydropower Plant. Lao Science Journal. 2026;3(1):153-168. doi:10.71026/ls.2026.030112
BibTeX
@article{INTHAVONG2026,
author = {INTHAVONG, Kongphang and SOUDTHISOMBUTH, Khamphoui},
title = {A Case Study on the Switching of Generator at Nammang3 Hydropower Plant},
journal = {Lao Science Journal},
year = {2026},
volume = {3},
number = {1},
pages = {153--168},
doi = {10.71026/ls.2026.030112}
}