EUVIMEDDescoperă EUVIMED
Open access · CC BY 4.0

Nova NR-10 (2026): principais mudanças e impactos para a engenharia elétrica, fiscalização de contratos e empreendimentos industriais.

Flavio Henrique Origuela Meira

Revista ft · 2026-07-07 · 30 (160) · 01-15

DOI: 10.69849/dafp0734 ↗

At a glance

Journal article in Revista ft, published online on 2026-07-07. Written by Flavio Henrique Origuela Meira. The full text is freely available (open access, CC BY 4.0).

RezumatDate bibliograficeCiteRelated studies

Abstract (original language)

Regulatory Standard No. 10 (NR-10) establishes minimum requirements for the safety and health of workers exposed to hazards arising from the use of electrical energy. In 2026, Ministry of Labor and Employment (MTE) Ordinance No. 737 approved a new wording for NR-10, introducing significant changes to how electrical risks must be identified, assessed, controlled, and documented by organizations. This article presents a technical analysis of the main changes introduced by the new NR-10, with an emphasis on Occupational Risk Management (GRO), protection against electric shock and arc flash, design requirements, worker training and authorization, technical documentation, and the impacts on the inspection of industrial contracts. It is concluded that the new wording strengthens the preventive approach, enhances documentary traceability, and demands greater integration among engineering, occupational safety, operation, maintenance, commissioning, and inspection.

Cite

APA

Meira, F. H. O. (2026). Nova NR-10 (2026): principais mudanças e impactos para a engenharia elétrica, fiscalização de contratos e empreendimentos industriais. Revista ft, 30(160), 01-15. https://doi.org/10.69849/dafp0734

Vancouver

Meira FHO. Nova NR-10 (2026): principais mudanças e impactos para a engenharia elétrica, fiscalização de contratos e empreendimentos industriais. Revista ft. 2026;30(160):01-15. doi:10.69849/dafp0734

BibTeX
@article{Meira2026,
  author = {Meira, Flavio Henrique Origuela},
  title = {Nova NR-10 (2026): principais mudanças e impactos para a engenharia elétrica, fiscalização de contratos e empreendimentos industriais},
  journal = {Revista ft},
  year = {2026},
  volume = {30},
  number = {160},
  pages = {01--15},
  doi = {10.69849/dafp0734}
}
Start for free →