Investigating the Key Risks in the Bidding Stage of Construction Projects in Afghanistan and How to Manage Them
Kabul Polytechnic University International Journal of Engineering & Technology · 22.08.2026 · 5 (2) · 77-94
DOI: 10.68924/ntnqva71 ↗Kurz gefasst
Fachartikel in der Zeitschrift Kabul Polytechnic University International Journal of Engineering & Technology, online erschienen am 22.08.2026. Verfasst von KHWAJA ESHAQ SEDIQI und 1 weiteren Autor:innen.
Abstract (Originalsprache)
This research emphasizes the reduction and management of risks arising from the bidding stage of construction projects, and its purpose is to identify the risks of the bidding stage of construction projects, analyze them, and finally find suitable ways to reduce and manage them. Managing the risks of the bidding stage is very important in all construction projects, but in this research, more emphasis is placed on public construction projects. Since the tendering stage in construction projects is a prelude to other subsequent stages, so in case of negligence in this stage, failure to identify the relevant risks and failure to manage them can cause challenges in the project and eventually the failure of the project. The method used in this research consists of studying books, scientific articles, internet sites, and also conducting a case study that was conducted in the Ministry of Public Health of Afghanistan, and finally, after identifying the risks, a comparison between the risks received from Through studies and the risks obtained through the case study. At the end of this research, results have been obtained, through which we can reduce and manage the risks of the bidding stage of construction projects. These results are very useful for the proper progress of the projects, and it is suggested that they be used in the tender stage of the projects in the future. At the end of this scientific article, good results have been obtained through which we can control and manage the risks of the bidding stage of construction projects. The result of this scientific article was the identification of (17) key risk types, which are summarized below: 1- Uncertainty in estimates. 2- Lack of study of previous projects. 3- Bidding on Wrong Projects. 4- Incomplete bid forms and documents. 5- Failing to visit the site. 6- Lack of complete information about the project. 7- Not evaluating equipment needs. 8- Not qualifying subcontractors. 9- Labor implications. 10- Lack of accurate information about wage rates. 11- Misunderstanding Material Requirements. 12- Rushed bids. 13- Overlooking risks. 14- Unhealthy competitions. 15- Inaccurate takeoff. 16- Scope creep. 17- Not enough time to announce an invitation to bidding.
Zitieren
APA
SEDIQI, K. E., & WAHEDY, M. N. (2026). Investigating the Key Risks in the Bidding Stage of Construction Projects in Afghanistan and How to Manage Them. Kabul Polytechnic University International Journal of Engineering & Technology, 5(2), 77-94. https://doi.org/10.68924/ntnqva71
Vancouver
SEDIQI KE, WAHEDY MN. Investigating the Key Risks in the Bidding Stage of Construction Projects in Afghanistan and How to Manage Them. Kabul Polytechnic University International Journal of Engineering & Technology. 2026;5(2):77-94. doi:10.68924/ntnqva71
BibTeX
@article{SEDIQI2026,
author = {SEDIQI, KHWAJA ESHAQ and WAHEDY, MOHAMMAD NAJIM},
title = {Investigating the Key Risks in the Bidding Stage of Construction Projects in Afghanistan and How to Manage Them},
journal = {Kabul Polytechnic University International Journal of Engineering & Technology},
year = {2026},
volume = {5},
number = {2},
pages = {77--94},
doi = {10.68924/ntnqva71}
}
EUVIMED