Investigating the Lack of Effective Communication Management Factors in the Implementation of Construction Projects in Kabul Afghanistan
Kabul Polytechnic University International Journal of Engineering & Technology · 22.08.2026 · 4 (1) · 135-156
DOI: 10.68924/b385x925 ↗Kurz gefasst
Fachartikel in der Zeitschrift Kabul Polytechnic University International Journal of Engineering & Technology, online erschienen am 22.08.2026. Verfasst von NOORULHAQ QAITMAS und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Effective communication management is crucial for the success of construction projects in Kabul, Afghanistan. However, there are significant challenges that hinder the attainment of effective communication practices in this context. This academic article aims to investigate the factors contributing to the lack of effective communication management in the implementation of construction projects in Kabul Afghanistan. The study utilizes a mixed-methods approach, combining questionnaire surveys with key stakeholders to gather data on communication needs, current practices, and challenges faced. Through data analysis, the article identifies key factors such as fragmented communication channels, unpromising trainings and resources for improving communication, cultural differences, not identifying the key stakeholders, to unutilized communication networks and tools for efficient information exchange, unpromising transparency and accountability, information overload, and language barriers that impede effective communication management. Drawing upon the findings, the article provides recommendations and strategies to enhance communication management in construction projects, including the establishment of effective communication channels between stakeholders’ establishment of clear protocols, Providing comprehensive training and resources, fostering a culture of open communication, addressing cultural and linguistic factors, Utilize feedback mechanisms, and leveraging technology. By addressing these factors, construction projects in Kabul Afghanistan can overcome communication challenges, improve coordination and collaboration, and ultimately achieve successful project outcomes. This article contributes to the existing literature by providing insights into the specific challenges faced in communication management in Kabul Afghanistan, and offering practical solutions for enhancing communication effectiveness in construction projects.
Zitieren
APA
QAITMAS, N., & WAHEDY, M. N. (2026). Investigating the Lack of Effective Communication Management Factors in the Implementation of Construction Projects in Kabul Afghanistan. Kabul Polytechnic University International Journal of Engineering & Technology, 4(1), 135-156. https://doi.org/10.68924/b385x925
Vancouver
QAITMAS N, WAHEDY MN. Investigating the Lack of Effective Communication Management Factors in the Implementation of Construction Projects in Kabul Afghanistan. Kabul Polytechnic University International Journal of Engineering & Technology. 2026;4(1):135-156. doi:10.68924/b385x925
BibTeX
@article{QAITMAS2026,
author = {QAITMAS, NOORULHAQ and WAHEDY, MOHAMMAD NAJIM},
title = {Investigating the Lack of Effective Communication Management Factors in the Implementation of Construction Projects in Kabul Afghanistan},
journal = {Kabul Polytechnic University International Journal of Engineering & Technology},
year = {2026},
volume = {4},
number = {1},
pages = {135--156},
doi = {10.68924/b385x925}
}
EUVIMED