EUVIMEDEUVIMED entdecken
Crossref

Investigating the Lack of Safety Management in Construction Projects: A Case Study in Kabul City, Afghanistan

GHULAM MOHAMMAD BASIRI, MOHAMMAD NAJIM WAHEDY

Kabul Polytechnic University International Journal of Engineering & Technology · 22.08.2026 · 5 (2) · 1-14

DOI: 10.68924/azmyes27 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Kabul Polytechnic University International Journal of Engineering & Technology, online erschienen am 22.08.2026. Verfasst von GHULAM MOHAMMAD BASIRI und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This research investigates the factors leading to a lack of safety management in construction projects in Kabul city. A questionnaire was distributed to 50 individuals, including project managers, safety officers, and contractors, and the data was analyzed using the RII method. The findings revealed that approximately 30 factors contribute to the deficiency in safety management in construction projects. Among these, the most critical factors include the lack of awareness among managers regarding safety, workers' non-compliance with personal protective equipment (such as safety helmets, goggles, gloves, safety shoes, and workwear), the absence of warning signs in hazardous workplace areas, negligence towards high-risk safety equipment, and workers' involvement in unfavorable physical and mental conditions (illness, lack of sleep, etc.). To enhance safety management, the research suggests providing training to workers and project personnel, utilizing personal protective equipment (PPE), adopting modern technologies and methodologies, using advanced machinery, and creating suitable physical and mental conditions for workers (reducing working hours, offering recreational activities, providing medical care, etc.). Implementing these measures will strengthen safety management and reduce its negative impacts.

Zitieren

APA

BASIRI, G. M., & WAHEDY, M. N. (2026). Investigating the Lack of Safety Management in Construction Projects: A Case Study in Kabul City, Afghanistan. Kabul Polytechnic University International Journal of Engineering & Technology, 5(2), 1-14. https://doi.org/10.68924/azmyes27

Vancouver

BASIRI GM, WAHEDY MN. Investigating the Lack of Safety Management in Construction Projects: A Case Study in Kabul City, Afghanistan. Kabul Polytechnic University International Journal of Engineering & Technology. 2026;5(2):1-14. doi:10.68924/azmyes27

BibTeX
@article{BASIRI2026,
  author = {BASIRI, GHULAM MOHAMMAD and WAHEDY, MOHAMMAD NAJIM},
  title = {Investigating the Lack of Safety Management in Construction Projects: A Case Study in Kabul City, Afghanistan},
  journal = {Kabul Polytechnic University International Journal of Engineering & Technology},
  year = {2026},
  volume = {5},
  number = {2},
  pages = {1--14},
  doi = {10.68924/azmyes27}
}
Kostenlos starten →