EUVIMEDEUVIMED entdecken
Crossref

Critical Path Method Adoption, Delay Factors and Schedule Crashing in Lagos Construction Projects: A Survey and a Proposed Six-Stage Framework

Yinka L. Ogunsola, Akinwale O. Coker

Iconic Research and Engineering Journals · 19.11.2026 · 10 (5) · 4071-4082

DOI: 10.64388/ire1725414 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Iconic Research and Engineering Journals, online erschienen am 19.11.2026. Verfasst von Yinka L. Ogunsola und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Ogunsola, Y. L., & Coker, A. O. (2026). Critical Path Method Adoption, Delay Factors and Schedule Crashing in Lagos Construction Projects: A Survey and a Proposed Six-Stage Framework. Iconic Research and Engineering Journals, 10(5), 4071-4082. https://doi.org/10.64388/ire1725414

Vancouver

Ogunsola YL, Coker AO. Critical Path Method Adoption, Delay Factors and Schedule Crashing in Lagos Construction Projects: A Survey and a Proposed Six-Stage Framework. Iconic Research and Engineering Journals. 2026;10(5):4071-4082. doi:10.64388/ire1725414

BibTeX
@article{Ogunsola2026,
  author = {Ogunsola, Yinka L. and Coker, Akinwale O.},
  title = {Critical Path Method Adoption, Delay Factors and Schedule Crashing in Lagos Construction Projects: A Survey and a Proposed Six-Stage Framework},
  journal = {Iconic Research and Engineering Journals},
  year = {2026},
  volume = {10},
  number = {5},
  pages = {4071--4082},
  doi = {10.64388/ire1725414}
}
Kostenlos starten →