EUVIMEDEUVIMED entdecken
Crossref

MICROSOFT PROJECT ENABLED SCHEDULE AND RESOURCE PLANNING IN CONSTRUCTION MANAGEMENT

Prajkta Desai Prajkta Desai

International Journal of Scientific Research in Engineering and Management · 2026-08 · 10 (8)

DOI: 10.55041/ijsrem.fce025 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Scientific Research in Engineering and Management, 2026-08. Verfasst von Prajkta Desai Prajkta Desai.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Desai, P. D. P. (2026). MICROSOFT PROJECT ENABLED SCHEDULE AND RESOURCE PLANNING IN CONSTRUCTION MANAGEMENT. International Journal of Scientific Research in Engineering and Management, 10(8). https://doi.org/10.55041/ijsrem.fce025

Vancouver

Desai PDP. MICROSOFT PROJECT ENABLED SCHEDULE AND RESOURCE PLANNING IN CONSTRUCTION MANAGEMENT. International Journal of Scientific Research in Engineering and Management. 2026;10(8). doi:10.55041/ijsrem.fce025

BibTeX
@article{Desai2026,
  author = {Desai, Prajkta Desai Prajkta},
  title = {MICROSOFT PROJECT ENABLED SCHEDULE AND RESOURCE PLANNING IN CONSTRUCTION MANAGEMENT},
  journal = {International Journal of Scientific Research in Engineering and Management},
  year = {2026},
  volume = {10},
  number = {8},
  doi = {10.55041/ijsrem.fce025}
}
Kostenlos starten →