Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints

Luqi Wang, Jinrui Li, Qizhi Ye, Yan Li, Anqi Feng

Buildings · 12.10.2024 · 14 (10) · 3231

DOI: 10.3390/buildings14103231 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 12.10.2024. Verfasst von Luqi Wang und 4 weiteren Autor:innen. Die Arbeit wurde bisher 11-mal zitiert (Crossref) und nennt 36 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Natural Science Foundation of Guangdong Province of China, National Natural Science Foundation of China, Guangdong Provincial Philosophy and Social Science Planning Project.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To enhance the application of building information modeling (BIM) in schedule management for engineering projects, improve spatial planning capabilities, and minimize subjective factors in schedule preparation, this paper presents a framework and method for automatic construction schedule planning based on BIM and data-driven approaches under multi-dimensional spatial resource constraints. The method includes data acquisition, construction process reasoning, time parameter calculation, and schedule generation and scheduling. Initially, the construction data from the BIM model and manual input are imported into the reasoning system to establish the logical relationships of the construction process. Construction time parameters and spatial resource requirements are then automatically calculated using MySQL. Subsequently, the spatial layout and resource allocation data exported from the BIM model are compared to assess whether the space meets the project requirements. Finally, a construction schedule that satisfies the space constraints is generated. The method was validated through a case study, demonstrating its effectiveness in automatic schedule planning under human-computer interaction. This study introduces an innovative approach that considers spatial conflicts in the automatic scheduling process, improving planning efficiency and reducing the risk of spatial conflicts on construction sites.

Förderung

  • Natural Science Foundation of Guangdong Province of China
  • National Natural Science Foundation of China
  • Guangdong Provincial Philosophy and Social Science Planning Project

Zitieren

APA

Wang, L., Li, J., Ye, Q., Li, Y., & Feng, A. (2024). Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints. Buildings, 14(10), 3231. https://doi.org/10.3390/buildings14103231

Vancouver

Wang L, Li J, Ye Q, Li Y, Feng A. Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints. Buildings. 2024;14(10):3231. doi:10.3390/buildings14103231

BibTeX
@article{Wang2024,
  author = {Wang, Luqi and Li, Jinrui and Ye, Qizhi and Li, Yan and Feng, Anqi},
  title = {Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints},
  journal = {Buildings},
  year = {2024},
  volume = {14},
  number = {10},
  pages = {3231},
  doi = {10.3390/buildings14103231}
}
Kostenlos starten →