RESOURCE PLANNING AND SCHEDULING OPTIMIZATION USING MICROSOFT PROJECT: A CASE STUDY OF MID-RISE RESIDENTIAL CONSTRUCTION IN LUCKNOW, UTTAR PRADESH
International Research Journal of Modernization in Engineering Technology & Science · 05.06.2026
DOI: 10.56726/irjmets99909 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Research Journal of Modernization in Engineering Technology & Science, online erschienen am 05.06.2026.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
(2026). RESOURCE PLANNING AND SCHEDULING OPTIMIZATION USING MICROSOFT PROJECT: A CASE STUDY OF MID-RISE RESIDENTIAL CONSTRUCTION IN LUCKNOW, UTTAR PRADESH. International Research Journal of Modernization in Engineering Technology & Science. https://doi.org/10.56726/irjmets99909
Vancouver
RESOURCE PLANNING AND SCHEDULING OPTIMIZATION USING MICROSOFT PROJECT: A CASE STUDY OF MID-RISE RESIDENTIAL CONSTRUCTION IN LUCKNOW, UTTAR PRADESH. International Research Journal of Modernization in Engineering Technology & Science. 2026. doi:10.56726/irjmets99909
BibTeX
@article{euvimed2026,
title = {RESOURCE PLANNING AND SCHEDULING OPTIMIZATION USING MICROSOFT PROJECT: A CASE STUDY OF MID-RISE RESIDENTIAL CONSTRUCTION IN LUCKNOW, UTTAR PRADESH},
journal = {International Research Journal of Modernization in Engineering Technology & Science},
year = {2026},
doi = {10.56726/irjmets99909}
}
EUVIMED