A BIM-Informed Multi-Objective Work-Zone Scheduling Model for Improving Crew Continuity and Resource Stability in Multi-Story Building Projects

Sultan Alkarawi, Firas Kh. Jaber, Aws S. Noaman

Civil and Sustainable Urban Engineering · 10.10.2026 · 6 (2)

DOI: 10.53623/csue.v6i2.1395 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Civil and Sustainable Urban Engineering, online erschienen am 10.10.2026. Verfasst von Sultan Alkarawi und 2 weiteren Autor:innen. Die Arbeit nennt 21 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction scheduling methods often lack effective integration of daily resource stability, work-zone sequencing, and specialist crew continuity, particularly in multi-story projects employing bottom-up floor sequencing. This study developed a BIM-informed multi-objective work-zone scheduling model to address these challenges. The model was applied to a five-story office building comprising 15 work zones and six repetitive activities, represented by 90 activity-zone records. The Non-dominated Sorting Genetic Algorithm II (NSGA-II) was employed to minimize work-package duration, cumulative crew idle time, and daily resource variation while satisfying precedence, crew exclusivity, non-preemption, workforce, workspace, concurrency, and bottom-up progression constraints. Ten independent runs were performed with a population size of 100 over 200 generations. The selected solution (168, 380, 219) achieved a work-package duration of 168 working days, cumulative crew idle time of 380 days, and a resource variation value of 219, representing reductions of 58.4%, 78.9%, and 18.6%, respectively, compared with sequential execution. An exhaustive evaluation of all 7,776 feasible sequences reproduced the same two-vector Pareto front, confirming the complete set of non-dominated solutions within the modeled search space. Sensitivity analysis identified crew efficiency and allowable zone concurrency as the primary factors influencing scheduling performance. The proposed model offers a practical decision-support tool for construction planners to balance project duration, crew continuity, and resource stability while maintaining a feasible and operationally interpretable bottom-up construction sequence.

Zitieren

APA

Alkarawi, S., Jaber, F. K., & Noaman, A. S. (2026). A BIM-Informed Multi-Objective Work-Zone Scheduling Model for Improving Crew Continuity and Resource Stability in Multi-Story Building Projects. Civil and Sustainable Urban Engineering, 6(2). https://doi.org/10.53623/csue.v6i2.1395

Vancouver

Alkarawi S, Jaber FK, Noaman AS. A BIM-Informed Multi-Objective Work-Zone Scheduling Model for Improving Crew Continuity and Resource Stability in Multi-Story Building Projects. Civil and Sustainable Urban Engineering. 2026;6(2). doi:10.53623/csue.v6i2.1395

BibTeX
@article{Alkarawi2026,
  author = {Alkarawi, Sultan and Jaber, Firas Kh. and Noaman, Aws S.},
  title = {A BIM-Informed Multi-Objective Work-Zone Scheduling Model for Improving Crew Continuity and Resource Stability in Multi-Story Building Projects},
  journal = {Civil and Sustainable Urban Engineering},
  year = {2026},
  volume = {6},
  number = {2},
  doi = {10.53623/csue.v6i2.1395}
}
Kostenlos starten →