Energy-Efficient Multi-Objective Scheduling for Modern Construction Projects with Dynamic Resource Constraints
Buildings · 17.01.2026 · 16 (2) · 392
DOI: 10.3390/buildings16020392 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 17.01.2026. Verfasst von Mudassar Rauf und 1 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 56 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Basic Scientific Research Project of Wenzhou City.
Abstract (Originalsprache)
The rapidly evolving business landscape, driven by stringent energy conservation policies, compels construction firms to adopt energy-efficient project-centric structures, particularly in modern construction projects. These firms face a complex, multi-mode, resource-constrained, multi-project scheduling problem characterized by dynamic project arrivals and multiple resource constraints, including global, local, and non-renewable capacities. This environment pressures managers to simultaneously optimize the conflicting objectives of minimizing total project duration and total energy consumption. To address this challenge, we propose a novel multi-objective Smart Raccoon Family Optimization (SRFO) algorithm. The SRFO, a hybrid evolutionary approach, is designed to enhance global exploration and local exploitation. Its performance is boosted by integrating a non-dominated sorting mechanism, a dedicated energy-efficient search strategy, and enhanced genetic operators. The SRFO simultaneously optimizes two conflicting objectives: minimizing the total project duration and total energy consumption. This approach effectively integrates the unique constraint of off-site component production and on-site assembly within an intelligent scheduling framework. Empirical validation across benchmark problems and a real-world case study is conducted, comparing the SRFO with existing multi-objective approaches, such as NSGA-III, MOABC, and MOSMO. Performance is assessed using convergence and distribution metrics, augmented by TOPSIS-based multi-criteria decision-making. Results conclusively demonstrate that the proposed SRFO significantly outperforms existing approaches and offers a robust, high-quality solution for project management in energy-constrained environments.
Förderung
- Basic Scientific Research Project of Wenzhou City
Zitieren
APA
Rauf, M., & Mumtaz, J. (2026). Energy-Efficient Multi-Objective Scheduling for Modern Construction Projects with Dynamic Resource Constraints. Buildings, 16(2), 392. https://doi.org/10.3390/buildings16020392
Vancouver
Rauf M, Mumtaz J. Energy-Efficient Multi-Objective Scheduling for Modern Construction Projects with Dynamic Resource Constraints. Buildings. 2026;16(2):392. doi:10.3390/buildings16020392
BibTeX
@article{Rauf2026,
author = {Rauf, Mudassar and Mumtaz, Jabir},
title = {Energy-Efficient Multi-Objective Scheduling for Modern Construction Projects with Dynamic Resource Constraints},
journal = {Buildings},
year = {2026},
volume = {16},
number = {2},
pages = {392},
doi = {10.3390/buildings16020392}
}
EUVIMED