ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN AKSES BUMI PERKEMAHAN GANDUS DENGAN METODE EARNED VALUE
Jurnal Teknik Sipil LATERAL · 2024
DOI: 10.52333/lateral.v2i1.208 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Teknik Sipil LATERAL, 2024. Verfasst von Verinazul Septriansyah und 4 weiteren Autor:innen.
Abstract (Originalsprache)
The Gandus Camping Ground Access Road Construction Project is required to be completed on time so that consumer confidence is maintained. To achieve this, control is needed which must be known in advance through ongoing project performance. One way to determine project performance is the Earned Value method which integrates aspects of cost, time and work performance. Therefore, this Earned Value analysis is applied to the Gandus Campground Access Road Construction Project. Project performance is analyzed based on cost performance index (Cost Performance Index) and time (Schedule Performance Index). Calculations are based on planned value, earned value and actual costs. Performance control is reviewed for 8 weeks, namely week 12 to week 19. The results of the analysis in weeks 12 to 19 show that the costs incurred were greater than planned and the implementation time was longer than planned as indicated by the average value of CPI = 0.976 (CPI
Zitieren
APA
Septriansyah, V., Umari, Z. F., Wartini, W., Akhirini, A., & Anugerah, R. (2024). ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN AKSES BUMI PERKEMAHAN GANDUS DENGAN METODE EARNED VALUE. Jurnal Teknik Sipil LATERAL. https://doi.org/10.52333/lateral.v2i1.208
Vancouver
Septriansyah V, Umari ZF, Wartini W, Akhirini A, Anugerah R. ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN AKSES BUMI PERKEMAHAN GANDUS DENGAN METODE EARNED VALUE. Jurnal Teknik Sipil LATERAL. 2024. doi:10.52333/lateral.v2i1.208
BibTeX
@article{Septriansyah2024,
author = {Septriansyah, Verinazul and Umari, Zuul Fitriana and Wartini, Wartini and Akhirini, Akhirini and Anugerah, Rizki},
title = {ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN AKSES BUMI PERKEMAHAN GANDUS DENGAN METODE EARNED VALUE},
journal = {Jurnal Teknik Sipil LATERAL},
year = {2024},
doi = {10.52333/lateral.v2i1.208}
}
EUVIMED