Analisis Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung SMKN 2 Kalianda

Vanita Kesumawati Yacub, Sari Anton, Arniza Fitri

Jurnal Ilmiah Rekayasa Sipil · 15.07.2026 · 23 (1) · 11-20

DOI: 10.30630/jirs.v23i1.4 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Ilmiah Rekayasa Sipil, online erschienen am 15.07.2026. Verfasst von Vanita Kesumawati Yacub und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Time control is one of the most important aspects in construction project management because it is directly related to the achievement of project objectives in terms of cost, quality, and completion time. Delays in construction projects may lead to various negative impacts, including increased operational costs, decreased labor productivity, and disruption of the planned building functions. Therefore, an effective project control method is required to provide accurate and measurable performance information so that project deviations can be identified at an early stage. This study aims to analyze the time performance of the SMKN 2 Kalianda Building Construction Project using the Earned Value Analysis (EVA) method. The project has a Budget at Completion (BAC) value of Rp1,117,768,579.83 with a planned duration of 24 weeks. The EVA method was selected because it integrates cost, time, and physical work progress into a single project performance evaluation system. The parameters used in this study include Planned Value (PV), Earned Value (EV), Schedule Variance (SV), and Schedule Performance Index (SPI). Based on the analysis conducted in the fifth week, the Planned Value (PV) was Rp. 11.960.123,80 and the Earned Value (EV) was Rp. 75.114.048,56. The calculation results indicated a positive Schedule Variance (SV) of Rp. 63.153.924,76 and a Schedule Performance Index (SPI) value of 6,28. An SPI value greater than 1 indicates that the project implementation was progressing faster than the planned schedule. Although fluctuations in project progress occurred during implementation, the applied control system was able to maintain project completion according to the planned target. The results of this study indicate that the Earned Value Analysis method is effective as a monitoring and evaluation tool for project time performance and can also function as an early warning system to support managerial decision-making in minimizing the risk of project delays.

Zitieren

APA

Yacub, V. K., Anton, S., & Fitri, A. (2026). Analisis Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung SMKN 2 Kalianda. Jurnal Ilmiah Rekayasa Sipil, 23(1), 11-20. https://doi.org/10.30630/jirs.v23i1.4

Vancouver

Yacub VK, Anton S, Fitri A. Analisis Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung SMKN 2 Kalianda. Jurnal Ilmiah Rekayasa Sipil. 2026;23(1):11-20. doi:10.30630/jirs.v23i1.4

BibTeX
@article{Yacub2026,
  author = {Yacub, Vanita Kesumawati and Anton, Sari and Fitri, Arniza},
  title = {Analisis Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung SMKN 2 Kalianda},
  journal = {Jurnal Ilmiah Rekayasa Sipil},
  year = {2026},
  volume = {23},
  number = {1},
  pages = {11--20},
  doi = {10.30630/jirs.v23i1.4}
}
Kostenlos starten →