EUVIMEDEUVIMED entdecken
Crossref

Analisis Kinerja Biaya dan Waktu Proyek Pembangunan Jotun Water-Based Production Facility di Bekasi Menggunakan Metode Earned Value

Adi Purnomo, Siti Abadiyah

Journal of Sustainable Civil Engineering (JOSCE) · 28.10.2026 · 8 (02) · 476-489

DOI: 10.47080/josce.v8i02.4947 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Sustainable Civil Engineering (JOSCE), online erschienen am 28.10.2026. Verfasst von Adi Purnomo und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Project management is the application of knowledge, skills, tools, and techniques in executing project activities to achieve predetermined objectives while considering the constraints of cost, time, and scope. The Jotun Water-Based Production Facility Bekasi construction project was planned to have a duration of 546 days, but its realization reached 630 days, resulting in a delay of 84 days. This study aims to determine how the estimated total cost and time of the work using the earned value method, as well as the profit or loss on the Jotun Water-Based Production Facility construction project. The research method used is descriptive quantitative by analyzing project performance based on Earned Value indicators. The analysis results show that the Estimate at Completion (EAC) is Rp96,386,423,076.92, with an estimated additional completion time of 12 weeks. The Estimate at Schedule (EAS) reaches 90 weeks. Based on these estimation results, assuming the project performance in the remaining period remains the same, the project is estimated to experience a loss of Rp12,851,523,076.92. This value is obtained from the difference in the Execution Budget Plan (RAP) at week 78 and week 90, including a tax of 11% of the Cost Budget Plan (RAB). The results show that the Earned Value method can be used to estimate the cost and completion time of the project based on the performance achieved and to identify potential cost and time deviations at the end of the project.

Zitieren

APA

Purnomo, A., & Abadiyah, S. (2026). Analisis Kinerja Biaya dan Waktu Proyek Pembangunan Jotun Water-Based Production Facility di Bekasi Menggunakan Metode Earned Value. Journal of Sustainable Civil Engineering (JOSCE), 8(02), 476-489. https://doi.org/10.47080/josce.v8i02.4947

Vancouver

Purnomo A, Abadiyah S. Analisis Kinerja Biaya dan Waktu Proyek Pembangunan Jotun Water-Based Production Facility di Bekasi Menggunakan Metode Earned Value. Journal of Sustainable Civil Engineering (JOSCE). 2026;8(02):476-489. doi:10.47080/josce.v8i02.4947

BibTeX
@article{Purnomo2026,
  author = {Purnomo, Adi and Abadiyah, Siti},
  title = {Analisis Kinerja Biaya dan Waktu Proyek Pembangunan Jotun Water-Based Production Facility di Bekasi Menggunakan Metode Earned Value},
  journal = {Journal of Sustainable Civil Engineering (JOSCE)},
  year = {2026},
  volume = {8},
  number = {02},
  pages = {476--489},
  doi = {10.47080/josce.v8i02.4947}
}
Kostenlos starten →