EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Symmetrically Construction Monitoring Analysis and Completed State Evaluation of a Tied Steel Box Arch Bridge Based on Finite Element Method

Jian Pan, Xirui Wang, Kainan Huang, Wensheng Wang

Symmetry · 18.04.2023 · 15 (4) · 932

DOI: 10.3390/sym15040932 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Symmetry, online erschienen am 18.04.2023. Verfasst von Jian Pan und 3 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 31 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Science and Technology Base and Talent Special Project of Guangxi Province, Scientific Research Project of the Department of Education of Jilin Province, Postdoctoral Researcher Selection Funding Project of Jilin Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Because of their beautiful appearance, strong crossing ability, and reasonable stress performance, the application of tied steel box arch bridges is becoming more and more extensive. Bridge construction monitoring can control and adjust the deviation state to ensure the stress and linear state of the bridge after completion. This study carried out a symmetrical construction monitoring analysis and completed state evaluation of the newly built Dafeng River Bridge in Guangxi Province based on the finite element method. MIDAS Civil finite element software is used for simulation analysis to calculate the deformation and stress of the tied steel box arch bridge at the construction and completion stages. The tensile and compressive stress of the main arch and transverse brace, as well as the cumulative displacements of the main arch and lattice beam, are symmetrically distributed. The maximum tensile and compressive stresses are 15.1 MPa and 74.6 MPa, respectively, less than the specification’s allowable value. Meanwhile, for the completed bridge under the loading combinations of serviceability limit state and bearing capacity ultimate limit state, the stress of the main arch, transverse brace, and lattice beam meets the specification requirements. The maximum cable forces of the suspender and tie rod under the bearing capacity ultimate limit state are 2189.4 kN and 2991.2 kN, and their corresponding minimum safety factors are 3.2 and 2.7. In addition, the deviations between the on-site monitoring and the finite element theoretical values are within the specification allowable range for the cable force of the suspender and tie rod and the bridge deck alignment. It indicates that the bridge construction monitoring effect is reasonable and ideal, and the symmetrically finite element simulation analysis can provide a theoretical basis for construction monitoring.

Förderung

  • Science and Technology Base and Talent Special Project of Guangxi Province
  • Scientific Research Project of the Department of Education of Jilin Province
  • Postdoctoral Researcher Selection Funding Project of Jilin Province

Zitieren

APA

Pan, J., Wang, X., Huang, K., & Wang, W. (2023). Symmetrically Construction Monitoring Analysis and Completed State Evaluation of a Tied Steel Box Arch Bridge Based on Finite Element Method. Symmetry, 15(4), 932. https://doi.org/10.3390/sym15040932

Vancouver

Pan J, Wang X, Huang K, Wang W. Symmetrically Construction Monitoring Analysis and Completed State Evaluation of a Tied Steel Box Arch Bridge Based on Finite Element Method. Symmetry. 2023;15(4):932. doi:10.3390/sym15040932

BibTeX
@article{Pan2023,
  author = {Pan, Jian and Wang, Xirui and Huang, Kainan and Wang, Wensheng},
  title = {Symmetrically Construction Monitoring Analysis and Completed State Evaluation of a Tied Steel Box Arch Bridge Based on Finite Element Method},
  journal = {Symmetry},
  year = {2023},
  volume = {15},
  number = {4},
  pages = {932},
  doi = {10.3390/sym15040932}
}
Kostenlos starten →