Construction Control of Temporary Steel Arch Falsework for a Long-Span Box Arch Bridge in a V-Shaped Canyon
Infrastructures · 05.11.2026 · 11 (11) · 411
DOI: 10.3390/infrastructures11110411 ↗Kurz gefasst
Fachartikel in der Zeitschrift Infrastructures, online erschienen am 05.11.2026. Verfasst von Yanling Liu und 4 weiteren Autor:innen. Die Arbeit nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
Construction of a long-span concrete arch in a V-shaped canyon requires coordinated control of the temporary falsework, erection stays and closure geometry. This study examines the temporary angle-steel truss falsework used for the Nujiang River reinforced-concrete box arch bridge, which has a 100 m clear span. A towerless rear-anchorage arrangement, construction-stage finite element analysis and a BIM-assisted geometric-control framework are presented. The preloading calculation uses a maximum design water-bag mass of 2480.6 t and gives a maximum displacement magnitude of 101 mm and a peak model stress magnitude of 218.4 MPa. Separately, preloading survey records at 20 points show downward elevation changes of 23–136 mm after three days and unloading recoveries of 14–71 mm. A nominal anchorage comparison is formulated using the adopted pile geometry and shaft-resistance parameters. Numerical closure-length cases illustrate the influence of geometric compatibility on the formed falsework, while three initial-tension histories illustrate the redistribution of erection-stay forces and final deflection profiles. The proposed control framework relates measurements to construction-stage targets through explicit reference states and local force–geometry sensitivities. The study provides a case-based procedure for organising geometric control and the associated structural checks during segmental falsework erection.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Liu, Y., Luo, L., Lu, B., Li, X., & Zhu, B. (2026). Construction Control of Temporary Steel Arch Falsework for a Long-Span Box Arch Bridge in a V-Shaped Canyon. Infrastructures, 11(11), 411. https://doi.org/10.3390/infrastructures11110411
Vancouver
Liu Y, Luo L, Lu B, Li X, Zhu B. Construction Control of Temporary Steel Arch Falsework for a Long-Span Box Arch Bridge in a V-Shaped Canyon. Infrastructures. 2026;11(11):411. doi:10.3390/infrastructures11110411
BibTeX
@article{Liu2026,
author = {Liu, Yanling and Luo, Lei and Lu, Baojie and Li, Xin and Zhu, Bing},
title = {Construction Control of Temporary Steel Arch Falsework for a Long-Span Box Arch Bridge in a V-Shaped Canyon},
journal = {Infrastructures},
year = {2026},
volume = {11},
number = {11},
pages = {411},
doi = {10.3390/infrastructures11110411}
}
EUVIMED