EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Measurement Analysis and Deformation Prediction Method Based on BPFEM

Xinwang Zhang, Bing Li, Mingkang Du, Yongsheng Ma, Hongxue Jia, Meng Liu, Chenkai Li, Wenkai Wang, Jinzhou Li, Xuesong Cheng

Buildings · 27.05.2026 · 16 (11) · 2145

DOI: 10.3390/buildings16112145 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 27.05.2026. Verfasst von Xinwang Zhang und 9 weiteren Autor:innen. Die Arbeit nennt 39 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Key Research and Development Program of China, Tianjin Science Foundation for Distinguished Young Scientists of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

With the increasing development in urban underground spaces towards greater depth, scale, and complexity, the prediction and control of deformations in deep excavation engineering have become critical challenges in geotechnical engineering. This study investigates the ultra-deep excavation of the Tianjin Metro Line 8 Liulitai Station, analyzing the deformation characteristics of the retaining structure during top-down construction in soft soil based on field monitoring data. The results reveal a typical “bulging” pattern in the horizontal displacement of the diaphragm wall, which accumulates progressively with excavation depth. To enhance deformation prediction accuracy, a self-developed beam-plate finite element method (BPFEM) platform, implemented in Python (version 3.11.9), is introduced. The platform integrates code-specified analytical methods and the incremental approach to simulate the internal forces and deformations of the support system with high precision. By incorporating a dual-parameter back-analysis technique—adjusting both the horizontal subgrade reaction modulus and active earth pressure—the numerical model achieves significantly improved agreement with monitoring data. The proposed method demonstrates strong predictive capability, with a maximum error of only 4.4% in subsequent construction stages, confirming its feasibility and reliability for deformation forecasting in top-down deep excavations. The BPFEM framework and parameter inversion strategy presented herein provide an effective technical basis for intelligent prediction and dynamic control in deep excavation projects under complex geological conditions.

Förderung

  • National Key Research and Development Program of China
  • Tianjin Science Foundation for Distinguished Young Scientists of China

Zitieren

APA

Zhang, X., Li, B., Du, M., Ma, Y., Jia, H., Liu, M., Li, C., Wang, W., Li, J., & Cheng, X. (2026). Measurement Analysis and Deformation Prediction Method Based on BPFEM. Buildings, 16(11), 2145. https://doi.org/10.3390/buildings16112145

Vancouver

Zhang X, Li B, Du M, Ma Y, Jia H, Liu M, et al. Measurement Analysis and Deformation Prediction Method Based on BPFEM. Buildings. 2026;16(11):2145. doi:10.3390/buildings16112145

BibTeX
@article{Zhang2026,
  author = {Zhang, Xinwang and Li, Bing and Du, Mingkang and Ma, Yongsheng and Jia, Hongxue and Liu, Meng and Li, Chenkai and Wang, Wenkai and Li, Jinzhou and Cheng, Xuesong},
  title = {Measurement Analysis and Deformation Prediction Method Based on BPFEM},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {11},
  pages = {2145},
  doi = {10.3390/buildings16112145}
}
Kostenlos starten →