Multi-objective Static-dynamic Scheduling for Dual-tunnel Construction under Spatiotemporal Constraints

Yu Li Tian, Lei Wang, Jin Kun Huang, An Bin Wang, An Chun Cheng

Periodica Polytechnica Civil Engineering · 23.04.2026 · 70 (2) · 436-455

DOI: 10.3311/ppci.43221 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Periodica Polytechnica Civil Engineering, online erschienen am 23.04.2026. Verfasst von Yu Li Tian und 4 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study develops a high-fidelity multi-objective static and dynamic scheduling model for dual-tunnel construction. To overcome topological deadlocks in tightly restricted spaces, complemented by a fine-grained time-slice mapping mechanism to eliminate resource fragmentation. At the static level, the optimization aims to minimize both the total make-span and the Weighted Resource Fluctuation Standard Deviation. A Memetic Algorithm-based Hybrid Genetic Algorithm (HGA) is proposed to solve the NP-hard problem. The algorithmic engine is fundamentally upgraded by incorporating an unbiased topological sequence initialization to expand the early exploration space, a dynamic continuity penalty function to ensure intra-cycle operational fluidity, and an elite local search strategy to overcome genetic hardening. Furthermore, the ε-constraint method is utilized to extract the exact Pareto front. An application to a 100-meter dual-tunnel engineering case demonstrates that the proposed HGA possess significant global optimization capabilities, while the rolling-horizon dynamic scheduling exhibits superior computational efficiency. The static optimization reduced the construction duration by 13.3% compared to the actual schedule, while the dynamic optimization achieved a 11.5% reduction under ideal conditions. Furthermore, disturbance simulation experiments confirm that this dynamic scheduling mechanism maintains a linear and stable increase in predicted duration across various disturbance scenarios, demonstrating excellent stability and robustness.

Zitieren

APA

Tian, Y. L., Wang, L., Huang, J. K., Wang, A. B., & Cheng, A. C. (2026). Multi-objective Static-dynamic Scheduling for Dual-tunnel Construction under Spatiotemporal Constraints. Periodica Polytechnica Civil Engineering, 70(2), 436-455. https://doi.org/10.3311/ppci.43221

Vancouver

Tian YL, Wang L, Huang JK, Wang AB, Cheng AC. Multi-objective Static-dynamic Scheduling for Dual-tunnel Construction under Spatiotemporal Constraints. Periodica Polytechnica Civil Engineering. 2026;70(2):436-455. doi:10.3311/ppci.43221

BibTeX
@article{Tian2026,
  author = {Tian, Yu Li and Wang, Lei and Huang, Jin Kun and Wang, An Bin and Cheng, An Chun},
  title = {Multi-objective Static-dynamic Scheduling for Dual-tunnel Construction under Spatiotemporal Constraints},
  journal = {Periodica Polytechnica Civil Engineering},
  year = {2026},
  volume = {70},
  number = {2},
  pages = {436--455},
  doi = {10.3311/ppci.43221}
}
Kostenlos starten →