A Robust Multi-Objective Evolutionary Framework for Artificial Island Construction Scheduling Under Dynamic Constraints
Journal of Marine Science and Engineering · 07.11.2024 · 12 (11) · 2008
DOI: 10.3390/jmse12112008 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Marine Science and Engineering, online erschienen am 07.11.2024. Verfasst von Tianju Zheng und 4 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 52 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Natural Science Foundation of Heilongjiang Province of China, National Key Research and Development Program of China, Heilongjiang Excellent Youth Fund Project.
Abstract (Originalsprache)
Artificial island construction is a multifaceted engineering endeavor that demands precise scheduling to optimize resource allocation, control costs, ensure safety, and minimize environmental impact within dynamic marine environments. This study introduces a comprehensive multi-objective optimization model that integrates critical factors such as resource limitations, task dependencies, environmental variability, safety risks, and regulatory compliance. To effectively address the complexities of this model, we develop and employ the Multi-Objective Adaptive Cooperative Evolutionary Marine Genetic Algorithm (MACEMGA). MACEMGA combines cooperative coevolution, adaptive dynamic weighting, dynamic penalty functions, and advanced genetic operators to navigate the solution space efficiently and identify Pareto optimal schedules. Through extensive computational experiments using data from the Dalian Bay Cross-Sea Traffic Engineering project, MACEMGA is benchmarked against algorithms such as NSGA-II, SPEA2, and MOEA/D. The results demonstrate that MACEMGA achieves a reduction in construction time from 32.8 to 23.5 months and cost savings from CNY 4105.3 million to CNY 3650.0 million while maintaining high-quality outcomes and compliance with environmental standards. Additionally, MACEMGA shows improvements in hypervolume by up to 15% over existing methods and a Convergence Rate that is 8% faster than MOEA/D.
Förderung
- Natural Science Foundation of Heilongjiang Province of China
- National Key Research and Development Program of China
- Heilongjiang Excellent Youth Fund Project
- Key Program for International Scientific and Technological Innovation Cooperation between Governments
- National Natural Science Foundation of China
Zitieren
APA
Zheng, T., Sun, L., Li, M., Yuan, G., & Li, S. (2024). A Robust Multi-Objective Evolutionary Framework for Artificial Island Construction Scheduling Under Dynamic Constraints. Journal of Marine Science and Engineering, 12(11), 2008. https://doi.org/10.3390/jmse12112008
Vancouver
Zheng T, Sun L, Li M, Yuan G, Li S. A Robust Multi-Objective Evolutionary Framework for Artificial Island Construction Scheduling Under Dynamic Constraints. Journal of Marine Science and Engineering. 2024;12(11):2008. doi:10.3390/jmse12112008
BibTeX
@article{Zheng2024,
author = {Zheng, Tianju and Sun, Liping and Li, Mingwei and Yuan, Guangyao and Li, Shuqi},
title = {A Robust Multi-Objective Evolutionary Framework for Artificial Island Construction Scheduling Under Dynamic Constraints},
journal = {Journal of Marine Science and Engineering},
year = {2024},
volume = {12},
number = {11},
pages = {2008},
doi = {10.3390/jmse12112008}
}
EUVIMED