Project Spotlight: All–precast concrete bridge demonstrates UHPC connection durability
PCI Journal · 2026 · 71 (5) · 20-21
DOI: 10.15554/pcij71.5-ps1 ↗Kurz gefasst
Fachartikel in der Zeitschrift PCI Journal, 2026. Verfasst von Stephanie Johnston.
Abstract (Originalsprache)
Replacing a corrugated metal pipe arch bridge with precast concrete joined with fast-curing ultra-high-performance concrete (UHPC) allowed the Delaware Department of Transportation to reopen the Blackbird Station Road 1-438 bridge in one-third the time of traditional construction meth¬ods. Precast Systems of Allentown, N.J., manufactured all structural components.
Zitieren
APA
Johnston, S. (2026). Project Spotlight: All–precast concrete bridge demonstrates UHPC connection durability. PCI Journal, 71(5), 20-21. https://doi.org/10.15554/pcij71.5-ps1
Vancouver
Johnston S. Project Spotlight: All–precast concrete bridge demonstrates UHPC connection durability. PCI Journal. 2026;71(5):20-21. doi:10.15554/pcij71.5-ps1
BibTeX
@article{Johnston2026,
author = {Johnston, Stephanie},
title = {Project Spotlight: All–precast concrete bridge demonstrates UHPC connection durability},
journal = {PCI Journal},
year = {2026},
volume = {71},
number = {5},
pages = {20--21},
doi = {10.15554/pcij71.5-ps1}
}
EUVIMED