EUVIMEDEUVIMED entdecken
Crossref

"Project Spotlight: Curved precast concrete U beams form sweeping S-shaped pedestrian bridge"

Stephanie Johnston

PCI Journal · 2026 · 71 (3) · 24-24

DOI: 10.15554/pcij71.3-ps2 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PCI Journal, 2026. Verfasst von Stephanie Johnston.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The award-winning Schuylkill River pedestrian bridge in down¬town Philadelphia, Pa. is believed to be the first cable-stayed pedestrian bridge to incorporate precast concrete curved U beams. PCI-certified precast concrete producer Fort Miller Co. Inc. of Schuylerville, N.Y., fabricated eight of these beams for the project. They are 7 ft (2.1 m) tall and 73 ft 9 in. to 80 ft (22 to 24 m) long and weigh 117 to 148 tons (106 to 134 tonnes). They conform to “PCI Guide Document for Curved U Beams,” U84-4, guidelines, except for the bottom flange, which was widened from 10 ft 9 in. to 13 ft (3 to 4 m) to accommodate the 25 ft (7.6 m) wide deck.

Zitieren

APA

Johnston, S. (2026). "Project Spotlight: Curved precast concrete U beams form sweeping S-shaped pedestrian bridge". PCI Journal, 71(3), 24-24. https://doi.org/10.15554/pcij71.3-ps2

Vancouver

Johnston S. "Project Spotlight: Curved precast concrete U beams form sweeping S-shaped pedestrian bridge". PCI Journal. 2026;71(3):24-24. doi:10.15554/pcij71.3-ps2

BibTeX
@article{Johnston2026,
  author = {Johnston, Stephanie},
  title = {"Project Spotlight: Curved precast concrete U beams form sweeping S-shaped pedestrian bridge"},
  journal = {PCI Journal},
  year = {2026},
  volume = {71},
  number = {3},
  pages = {24--24},
  doi = {10.15554/pcij71.3-ps2}
}
Kostenlos starten →