Project Spotlight: Three bridges, 10 miles of precast concrete girders, one award-winning project

Stephanie Johnston

PCI Journal · 2026 · 71 (3) · 23-23

DOI: 10.15554/pcij71.3-ps1 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PCI Journal, 2026. Verfasst von Stephanie Johnston.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Concrete Technology Corp., based in Tacoma, Wash., helped the Washington State Department of Transportation accelerate con¬struction of three bridges at the intersection of State Route 520 and Montlake Boulevard in Seattle, Wash., by fabricating almost 600 precast, prestressed concrete girders, voided slabs, columns, and pile caps

Zitieren

APA

Johnston, S. (2026). Project Spotlight: Three bridges, 10 miles of precast concrete girders, one award-winning project. PCI Journal, 71(3), 23-23. https://doi.org/10.15554/pcij71.3-ps1

Vancouver

Johnston S. Project Spotlight: Three bridges, 10 miles of precast concrete girders, one award-winning project. PCI Journal. 2026;71(3):23-23. doi:10.15554/pcij71.3-ps1

BibTeX
@article{Johnston2026,
  author = {Johnston, Stephanie},
  title = {Project Spotlight: Three bridges, 10 miles of precast concrete girders, one award-winning project},
  journal = {PCI Journal},
  year = {2026},
  volume = {71},
  number = {3},
  pages = {23--23},
  doi = {10.15554/pcij71.3-ps1}
}
Kostenlos starten →