Crossref
Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network
Architectural Research · 2009-12 · 11 (2) · 43-49
DOI: 10.1007/bf03656185 ↗At a glance
Journal article in Architectural Research, published online on 2009-12-01. Written by Seon-Gyoo Kim. 4 references.
Abstract (original language)
Intet abstract tilgængeligt.
Cite
APA
Kim, S. (2009). Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network. Architectural Research, 11(2), 43-49. https://doi.org/10.1007/bf03656185
Vancouver
Kim S. Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network. Architectural Research. 2009;11(2):43-49. doi:10.1007/bf03656185
BibTeX
@article{Kim2009,
author = {Kim, Seon-Gyoo},
title = {Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network},
journal = {Architectural Research},
year = {2009},
volume = {11},
number = {2},
pages = {43--49},
doi = {10.1007/bf03656185}
}
EUVIMED