EUVIMEDEUVIMED entdecken
Crossref

Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network

Seon-Gyoo Kim

Architectural Research · 2009-12 · 11 (2) · 43-49

DOI: 10.1007/bf03656185 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Architectural Research, online erschienen am 01.12.2009. Verfasst von Seon-Gyoo Kim. Die Arbeit nennt 4 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Kim, S. (2009). Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network. Architectural Research, 11(2), 43-49. https://doi.org/10.1007/bf03656185

Vancouver

Kim S. Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network. Architectural Research. 2009;11(2):43-49. doi:10.1007/bf03656185

BibTeX
@article{Kim2009,
  author = {Kim, Seon-Gyoo},
  title = {Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network},
  journal = {Architectural Research},
  year = {2009},
  volume = {11},
  number = {2},
  pages = {43--49},
  doi = {10.1007/bf03656185}
}
Kostenlos starten →