Old Sava Bridge in Belgrade‐Removal of the Bridge Superstructure‐Design and execution
ce/papers · 2026-09 · 9 (2-3) · 1408-1413
DOI: 10.1002/cepa.70355 ↗Kurz gefasst
Fachartikel in der Zeitschrift ce/papers, online erschienen am 14.09.2026. Verfasst von Slobodan Jaćović und 7 weiteren Autor:innen. Die Arbeit nennt 4 Literaturangaben.
Abstract (Originalsprache)
Old Sava Bridge was the war bridge in Belgrade city centre, built in 1942, by the German Reich, purposed to maintain the connection over the Sava River in Belgrade, when it was interrupted by the demolition of King Alexander Bridge. The bridge has been built as a temporary structure for military transport and served as a main tram bridge in Belgrade until 2020. The structural system of the old bridge is designed as a riveted steel continuous beam, with the main span of 106m as a bowstring arch with vertical hangers. The bridge has been repaired and/or reconstructed on multiple occasions (1954, 1966, 1972, 1983 and 2007) due to the consequences of the bombardment, intensive traffic and the adoption of tram traffic on the bridge. Everyday traffic over the bridge was causing unacceptable noise and vibrations, accompanied by additional problems related to the functionality of the existing light steel bridge deck, thus there was an imminent need for mitigation of these effects. Considering the state of the steel structure, piers and foundations, adequacy for the new demands regarding river navigational profile, old steel material, and capabilities of further repairs and reconstructions of the carriageway structure, total demolition of the old bridge has been decided. This Paper displays design and execution aspects of the bridge superstructure removal, especially related to the design of the phased deconstruction of the steel structure and the employment of the specialized machinery for the disassembly in urban areas.
Zitieren
APA
Jaćović, S., Xin, L., Kukaras, D., Kajević, E., Ákos, E. Z., Vujičić, J., Mandić, M., & Ristić, V. (2026). Old Sava Bridge in Belgrade‐Removal of the Bridge Superstructure‐Design and execution. ce/papers, 9(2-3), 1408-1413. https://doi.org/10.1002/cepa.70355
Vancouver
Jaćović S, Xin L, Kukaras D, Kajević E, Ákos EZ, Vujičić J, et al. Old Sava Bridge in Belgrade‐Removal of the Bridge Superstructure‐Design and execution. ce/papers. 2026;9(2-3):1408-1413. doi:10.1002/cepa.70355
BibTeX
@article{Jaovi2026,
author = {Jaćović, Slobodan and Xin, Li and Kukaras, Danijel and Kajević, Elvir and Ákos, Etényi Zalán and Vujičić, Jovana and Mandić, Mirjana and Ristić, Vule},
title = {Old Sava Bridge in Belgrade‐Removal of the Bridge Superstructure‐Design and execution},
journal = {ce/papers},
year = {2026},
volume = {9},
number = {2-3},
pages = {1408--1413},
doi = {10.1002/cepa.70355}
}
EUVIMED