EUVIMEDEUVIMED entdecken
Crossref

Pál Tomori Danube bridge at Kalocsa and Paks - Design of the main river bridge

Sándor Kisbán, Pál Pusztai, Rudolf Kiss

Concrete Structures · 2026 · 27 · 6-12

DOI: 10.32970/cs.2026.1.2 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Concrete Structures, 2026. Verfasst von Sándor Kisbán und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The new Tomori Pál Bridge, located in the vicinity of Kalocsa and Paks, the 20th bridge on the Hungarian section of the Danube, was opened to traffic in June 2024. The construction work on the bridge was carried out by Duna Aszfalt Zrt. The bridge design tasks were undertaken by CÉH zRt., as the lead designer of the bridge, and Pont-TERV Zrt. In this article, we describe the design process and experiences gained during construction of the extradosed river bridge spanning the Danube, which is part of a structure comprising three bridges with a total length of 946 m. In this article, we present the main load-bearing structural elements of the river bridge. The descriptions detail the design conditions that influenced the configuration of the structural elements.

Zitieren

APA

Kisbán, S., Pusztai, P., & Kiss, R. (2026). Pál Tomori Danube bridge at Kalocsa and Paks - Design of the main river bridge. Concrete Structures, 27, 6-12. https://doi.org/10.32970/cs.2026.1.2

Vancouver

Kisbán S, Pusztai P, Kiss R. Pál Tomori Danube bridge at Kalocsa and Paks - Design of the main river bridge. Concrete Structures. 2026;27:6-12. doi:10.32970/cs.2026.1.2

BibTeX
@article{Kisbn2026,
  author = {Kisbán, Sándor and Pusztai, Pál and Kiss, Rudolf},
  title = {Pál Tomori Danube bridge at Kalocsa and Paks - Design of the main river bridge},
  journal = {Concrete Structures},
  year = {2026},
  volume = {27},
  pages = {6--12},
  doi = {10.32970/cs.2026.1.2}
}
Kostenlos starten →