EUVIMEDEUVIMED entdecken
Crossref

New Sava Bridge in Belgrade – Bridge Superstructure – Design and execution aspects

Slobodan Jaćović, Li Xin, Danijel Kukaras, Elvir Kajević, Zlatko Marković, Jovana Vujičić, Mirjana Mandić, Vule Ristić

ce/papers · 2026-09 · 9 (2-3) · 1402-1407

DOI: 10.1002/cepa.70309 ↗

Kurz gefasst

Fachartikel in der Zeitschrift ce/papers, online erschienen am 14.09.2026. Verfasst von Slobodan Jaćović und 7 weiteren Autor:innen. Die Arbeit nennt 8 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

New Sava Bridge Project started in 2020 as a Design‐Build contract between the Republic of Serbia and the Chinese company PowerChina International, for the building of the new, modern bridge with the higher capacity at the same location of the Old Sava Bridge. Now that most of the old bridge has been removed, Design for Execution finished, extensive construction works are advancing for the building of the New Bridge. The New Sava bridge shall be 420m long, with 166m main span over Sava River navigation profile. The superstructure of the bridge is designed as aesthetic, innovative continuous composite girder, supported with two asymmetric arches in the main span. This Paper presents design and execution challenges in construction of modern bridge structures in urban environments, as a Project of the replacement of old bridge.

Zitieren

APA

Jaćović, S., Xin, L., Kukaras, D., Kajević, E., Marković, Z., Vujičić, J., Mandić, M., & Ristić, V. (2026). New Sava Bridge in Belgrade – Bridge Superstructure – Design and execution aspects. ce/papers, 9(2-3), 1402-1407. https://doi.org/10.1002/cepa.70309

Vancouver

Jaćović S, Xin L, Kukaras D, Kajević E, Marković Z, Vujičić J, et al. New Sava Bridge in Belgrade – Bridge Superstructure – Design and execution aspects. ce/papers. 2026;9(2-3):1402-1407. doi:10.1002/cepa.70309

BibTeX
@article{Jaovi2026,
  author = {Jaćović, Slobodan and Xin, Li and Kukaras, Danijel and Kajević, Elvir and Marković, Zlatko and Vujičić, Jovana and Mandić, Mirjana and Ristić, Vule},
  title = {New Sava Bridge in Belgrade – Bridge Superstructure – Design and execution aspects},
  journal = {ce/papers},
  year = {2026},
  volume = {9},
  number = {2-3},
  pages = {1402--1407},
  doi = {10.1002/cepa.70309}
}
Kostenlos starten →