The Santo Antônio Hydroelectric Power Plant is one of Brazil's major power generation projects and plays a strategic role in the National Interconnected System (SIN). Beyond its importance to energy supply, its implementation brought about environmental, social, and economic transformations in the Amazon region, necessitating an integrated analysis of these various aspects. This study aimed to analyze the implementation, operation, and management of the Santo Antônio plant, highlighting its technical characteristics, its integration into the SIN, the operational indicators used to monitor the project, and the key socio-environmental impacts resulting from its implementation and operation. The research was conducted as a case study using a literature review and document analysis, drawing on data from official bodies—such as the National Electric System Operator (ONS), the National Water and Basic Sanitation Agency (ANA), the National Electric Energy Agency (ANEEL), the Brazilian Institute of the Environment and Renewable Natural Resources (IBAMA), and the Energy Research Office (EPE)—as well as documents from the concessionaire Santo Antônio Energia and scientific studies on the Madeira River Hydroelectric Complex. The results demonstrate that adopting a run-of-river plant model with bulb-type turbines enabled high generation capacity with a smaller flooded area compared to conventional projects. The study also confirmed the strong influence of the Madeira River's hydrological regime on the plant's operation, a fact highlighted during the extreme drought of 2023. It is concluded that the Santo Antônio plant is highly significant for national energy security; however, its sustainability depends on integrating operational efficiency, environmental management, and continuous monitoring of the social and environmental impacts associated with the project.
Zitieren
APA
Azevedo, A. C. R., Pimentel, N. M. D. S. R., & Cantanhede, M. P. (2026). Avaliação do desempenho operacional da UHE Santo Antônio no SIN após implantação: aderência ao planejamento, trajetória de licenciamento/implantação e determinantes de performance. Revista ft, 30(159), 01-28. https://doi.org/10.69849/kehztw66
Vancouver
Azevedo ACR, Pimentel NMDSR, Cantanhede MP. Avaliação do desempenho operacional da UHE Santo Antônio no SIN após implantação: aderência ao planejamento, trajetória de licenciamento/implantação e determinantes de performance. Revista ft. 2026;30(159):01-28. doi:10.69849/kehztw66
BibTeX
@article{Azevedo2026,
author = {Azevedo, Ana Clara Reis and Pimentel, Nathalia Martins da Silva Reis and Cantanhede, Messias Pimentel},
title = {Avaliação do desempenho operacional da UHE Santo Antônio no SIN após implantação: aderência ao planejamento, trajetória de licenciamento/implantação e determinantes de performance},
journal = {Revista ft},
year = {2026},
volume = {30},
number = {159},
pages = {01--28},
doi = {10.69849/kehztw66}
}
EUVIMED