Determinants of Cost Overruns in Public Infrastructure Projects in Afghanistan: An Empirical Analysis
Scientific Journal of Engineering, and Technology · 21.07.2026 · 3 (2) · 59-69
DOI: 10.69739/sjet.v3i2.2138 ↗Kurz gefasst
Fachartikel in der Zeitschrift Scientific Journal of Engineering, and Technology, online erschienen am 21.07.2026. Verfasst von Jan Mohammad Saber und 4 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Cost overruns continue to be among the most persistent problems encountered while delivering public sector infrastructure projects in environments that suffer from uncertainties in institutional, financial, and operational areas. This study attempts to recognize, analyze, and rank the critical determinants of cost overruns in the context of public infrastructure projects in Afghanistan. The study used quantitative methods for research, along with an abductive approach where the researchers used a questionnaire for analysis based on the information gathered from 89 experts associated with 29 infrastructure projects. From the results, the occurrence of cost overruns is influenced by various factors, including management, technical, financial, institutional, and situational factors. Lack of accessibility to project sites (RII = 0.9798), existence of instability in project regions (RII = 0.9753), corruption (RII = 0.9483), incorrect quantity estimation (RII = 0.9438), and unrealistically tight project schedules (RII = 0.9303) were found to be the top contributing factors to the occurrence of cost overruns. The findings also show that 45.45% of the completed projects suffered from cost overruns. Based on the results of the investigation, cost overruns can be characterized as being inherent to their nature due to their emergence through a combination of weak corporate governance, poor project preparations, technical limitations, and external factors. These results have practical implications for all interested parties looking to improve the cost performance and sustainability of their projects.
Zitieren
APA
Saber, J. M., Amin, W., Faqiri, A., Ayaz, M. H., & Totakhel, M. Q. (2026). Determinants of Cost Overruns in Public Infrastructure Projects in Afghanistan: An Empirical Analysis. Scientific Journal of Engineering, and Technology, 3(2), 59-69. https://doi.org/10.69739/sjet.v3i2.2138
Vancouver
Saber JM, Amin W, Faqiri A, Ayaz MH, Totakhel MQ. Determinants of Cost Overruns in Public Infrastructure Projects in Afghanistan: An Empirical Analysis. Scientific Journal of Engineering, and Technology. 2026;3(2):59-69. doi:10.69739/sjet.v3i2.2138
BibTeX
@article{Saber2026,
author = {Saber, Jan Mohammad and Amin, Wahidullah and Faqiri, Amanullah and Ayaz, Mohammad Hashim and Totakhel, Muhammad Qais},
title = {Determinants of Cost Overruns in Public Infrastructure Projects in Afghanistan: An Empirical Analysis},
journal = {Scientific Journal of Engineering, and Technology},
year = {2026},
volume = {3},
number = {2},
pages = {59--69},
doi = {10.69739/sjet.v3i2.2138}
}
EUVIMED