Analysis of Key Factors Contributing to Cost Overruns in Commercial Construction Projects in Delhi NCR Region

Akshara Chad

Dandao Xuebao/Journal of Ballistics · 29.05.2026 · 38 (2) · 1060-1077

DOI: 10.52783/dxjb.v38.457 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Dandao Xuebao/Journal of Ballistics, online erschienen am 29.05.2026. Verfasst von Akshara Chad.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Cost overruns in commercial building, especially in rapidly urbanising metropolitan regions, nevertheless exist. Despite the advances in project management systems, complex regulatory regimes, fluctuating material markets, and frequent design revisions have exacerbated the budgetary difficulties in Delhi NCR of India. The study empirically investigates the important elements responsible for cost overrun in commercial construction projects in Delhi-NCR using mixed-method research technique. For data triangulation, primary data were collected by structured questionnaire surveys with 102 industry professionals and supported by expert interviews. Quantitative analysis was performed using Relative Importance Index (RII), Principal Component Analysis (PCA), correlation analysis and multiple linear regression modelling. The results showed that the most common causes of cost overrun are the material price fluctuation, wrong initial cost estimation, frequent changes in design and defects in planning and scheduling. The model explained 65.9% of the variance in project cost performance, which indicates the importance of early planning and market associated risks. The findings are confirmed by qualitative data that further elaborate the coordination gaps among stakeholders and delays in regulatory approval as important contextual challenges particular to the Delhi NCR region. This study gives region-specific empirical evidence to the literature on cost overruns and emphasises the importance of risk-adjusted cost forecasting, better design governance and proactive procurement planning. The findings provide practical insights to project managers, consultants, contractors and policy makers who intend to improve the cost predictability and management of commercial development projects in fast rising metropolitan contexts.

Zitieren

APA

Chad, A. (2026). Analysis of Key Factors Contributing to Cost Overruns in Commercial Construction Projects in Delhi NCR Region. Dandao Xuebao/Journal of Ballistics, 38(2), 1060-1077. https://doi.org/10.52783/dxjb.v38.457

Vancouver

Chad A. Analysis of Key Factors Contributing to Cost Overruns in Commercial Construction Projects in Delhi NCR Region. Dandao Xuebao/Journal of Ballistics. 2026;38(2):1060-1077. doi:10.52783/dxjb.v38.457

BibTeX
@article{Chad2026,
  author = {Chad, Akshara},
  title = {Analysis of Key Factors Contributing to Cost Overruns in Commercial Construction Projects in Delhi NCR Region},
  journal = {Dandao Xuebao/Journal of Ballistics},
  year = {2026},
  volume = {38},
  number = {2},
  pages = {1060--1077},
  doi = {10.52783/dxjb.v38.457}
}
Kostenlos starten →