EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Multi-Objective Optimization of Multi-Factory Remanufacturing Process Considering Worker Fatigue

Liangbo Zhou, Haibin Zhu, Behzad Akbari

International Journal of Artificial Intelligence and Green Manufacturing · 29.06.2026 · 1 (2)

DOI: 10.67119/7936arid ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Artificial Intelligence and Green Manufacturing, online erschienen am 29.06.2026. Verfasst von Liangbo Zhou und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To achieve sustainable manufacturing of large-scale discarded products, disassembly, recycling, and remanufacturing are widely adopted across various industries. Multi-factory remanufacturing is a complex working model that requires coordination among different factories for disassembly, remanufacturing, and resource circulation to achieve optimal resource reuse and reduce environmental impact. Multi-skilled workers play a crucial role in this process, and to fully harness the potential of workers, skill training and task allocation need to be considered. On the other hand, prolonged disassembly leads to an increase in worker fatigue levels. Excessive fatigue can result in reduced work efficiency and quality, even posing a threat to worker health and safety. Considering the impact of worker fatigue during disassembly is essential for achieving healthy and efficient work. This work presents and addresses a multi-factory remanufacturing process optimization problem that considers worker fatigue. This problem is divided into three phases: disassembly factory selection, disassembly scheduling, and manufacturing factory selection. With the objectives of maximizing profit and minimizing fatigue index, a linear programming mathematical model is established. Based on this, a discrete battle royale optimizer is employed to solve the problem, and a novel encoding structure is designed. The superiority and effectiveness of the proposed optimizer are validated through experiments on different scale cases and by comparing the results with the carnivorous plant optimizer, migrating birds optimizer, dingo optimizer, and fruit fly optimizer.

Zitieren

APA

Zhou, L., Zhu, H., & Akbari, B. (2026). Multi-Objective Optimization of Multi-Factory Remanufacturing Process Considering Worker Fatigue. International Journal of Artificial Intelligence and Green Manufacturing, 1(2). https://doi.org/10.67119/7936arid

Vancouver

Zhou L, Zhu H, Akbari B. Multi-Objective Optimization of Multi-Factory Remanufacturing Process Considering Worker Fatigue. International Journal of Artificial Intelligence and Green Manufacturing. 2026;1(2). doi:10.67119/7936arid

BibTeX
@article{Zhou2026,
  author = {Zhou, Liangbo and Zhu, Haibin and Akbari, Behzad},
  title = {Multi-Objective Optimization of Multi-Factory Remanufacturing Process Considering Worker Fatigue},
  journal = {International Journal of Artificial Intelligence and Green Manufacturing},
  year = {2026},
  volume = {1},
  number = {2},
  doi = {10.67119/7936arid}
}
Kostenlos starten →