Order Driven Disassemby Worker Scheduling for Multi-Factory Remanufacturing Optimization
International Journal of Artificial Intelligence and Green Manufacturing · 06.04.2026 · 2 (1)
DOI: 10.67119/4729kfjd ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Artificial Intelligence and Green Manufacturing, online erschienen am 06.04.2026. Verfasst von Chenggang Zheng und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Multi-factory remanufacturing systems often operate under practical constraints, including heterogeneous taskrequirements and limited availability of skilled labor, wherefactory and workstation operations cannot be assumed to becontinuously active. In such environments, worker availabilityand order demand jointly determine factory activation, workstation utilization, and task allocation, leading to tightly coupleddecisions across multiple resource levels. Effectively coordinatingthese interdependent factors is critical for improving operationalefficiency in distributed remanufacturing networks. This studyinvestigates a multi-factory remanufacturing problem that jointlyoptimizes order allocation, worker assignment, and factory activation decisions under labor constraints. A mixed-integer linearprogramming model is developed to capture the interactionsamong factories, workstations, and workers while consideringdisassembly task structures derived from order requirements.To solve the resulting complex optimization problem, the AlphaEvolution algorithm is employed and compared with severalrepresentative metaheuristic approaches, including the ImprovedBeluga Whale Reproductive Optimization, Coati Population Algorithm, Fruit Fly Optimization Algorithm, Dingo OptimizationAlgorithm, and Modified Dung Beetle Mating Optimization. Experimental results demonstrate that coordinated resource activation can significantly enhance labor utilization and overall systemperformance. The proposed Alpha Evolution algorithm approachachieves competitive or superior performance in solution qualityand stability across multiple test scenarios.
Zitieren
APA
Zheng, C., Tang, Y., Wang, W., & Kang, Q. (2026). Order Driven Disassemby Worker Scheduling for Multi-Factory Remanufacturing Optimization. International Journal of Artificial Intelligence and Green Manufacturing, 2(1). https://doi.org/10.67119/4729kfjd
Vancouver
Zheng C, Tang Y, Wang W, Kang Q. Order Driven Disassemby Worker Scheduling for Multi-Factory Remanufacturing Optimization. International Journal of Artificial Intelligence and Green Manufacturing. 2026;2(1). doi:10.67119/4729kfjd
BibTeX
@article{Zheng2026,
author = {Zheng, Chenggang and Tang, Ying and Wang, Weitian and Kang, Qi},
title = {Order Driven Disassemby Worker Scheduling for Multi-Factory Remanufacturing Optimization},
journal = {International Journal of Artificial Intelligence and Green Manufacturing},
year = {2026},
volume = {2},
number = {1},
doi = {10.67119/4729kfjd}
}
EUVIMED