EUVIMEDEUVIMED entdecken
Crossref

Effects of Incorrect Scope Definition on Success of Construction Projects in Kabul City

Wahidullah Mahmood, M. Najim Wahedy, Hamidullah Azimi, Zabihullah Rustami

Bakhtar Journal of Engineering and Technology · 20.03.2026 · 1 (3) · 37

DOI: 10.65460/bjet/vol1_iss3_a4 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Bakhtar Journal of Engineering and Technology, online erschienen am 20.03.2026. Verfasst von Wahidullah Mahmood und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The role of the scope of work (SOW) in construction projects has been underestimated for decades, and this is one of the reasons for the failure of most projects in Afghanistan, especially in Kabul. These projects share many of the same complications, challenges, and greater severity with unattended goals. Failure to define tasks and objectives clearly in the SOW is catastrophic, a confusion of the objectives and project. This article assesses the effects of incorrect scope definition on the success of construction projects in Kabul City. To study the SOW, a mixed-methods research approach will be used. This approach involves collecting both quantitative and qualitative data to provide an all-inclusive understanding of the research problem. This approach ensures that project results are reliable, accurate, and applicable in real-world scenarios. The article identified gaps and recommends possible solutions to improve the execution of construction projects with consideration of a comprehensive SOW to contribute to the reduction of negative impacts on the success of construction projects in Kabul City. The findings will be helpful for project managers, contractors, and other stockholders in the construction industry, as well as for policymakers and regulators responsible for delivering projects. In due course, the article aims to advance project outcomes and increase efficiency and effectiveness. By using the comprehensive SOW, construction projects can be completed on time and within budget, as well as ensure maintaining a healthy profit margin.

Zitieren

APA

Mahmood, W., Wahedy, M. N., Azimi, H., & Rustami, Z. (2026). Effects of Incorrect Scope Definition on Success of Construction Projects in Kabul City. Bakhtar Journal of Engineering and Technology, 1(3), 37. https://doi.org/10.65460/bjet/vol1_iss3_a4

Vancouver

Mahmood W, Wahedy MN, Azimi H, Rustami Z. Effects of Incorrect Scope Definition on Success of Construction Projects in Kabul City. Bakhtar Journal of Engineering and Technology. 2026;1(3):37. doi:10.65460/bjet/vol1_iss3_a4

BibTeX
@article{Mahmood2026,
  author = {Mahmood, Wahidullah and Wahedy, M. Najim and Azimi, Hamidullah and Rustami, Zabihullah},
  title = {Effects of Incorrect Scope Definition on Success of Construction Projects in Kabul City},
  journal = {Bakhtar Journal of Engineering and Technology},
  year = {2026},
  volume = {1},
  number = {3},
  pages = {37},
  doi = {10.65460/bjet/vol1_iss3_a4}
}
Kostenlos starten →