EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Control of Raw Material Inventories N-108 and L-107 Using the Material Requirements Planning Method

Amelia Nur Aini, Elly Ismiyah, Yanuar Pandu Negoro

Jurnal Riset Ilmu Teknik · 22.11.2026 · 4 (3) · 312-321

DOI: 10.59976/jurit.v4i3.421 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Riset Ilmu Teknik, online erschienen am 22.11.2026. Verfasst von Amelia Nur Aini und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study evaluates inventory policies for N-108 and L-107, two raw materials used in emulsion paint and paper resin production. It identifies the ordering method with the lowest inventory cost while meeting material requirements from January to June 2026. Monthly opening stocks, receipts and usage were checked against recorded closing stocks. Three-period moving average (MA-3) and single exponential smoothing (SES) forecasts were compared over April–June. Lot-for-lot (LFL), economic order quantity (EOQ) and period order quantity (POQ) were then evaluated using historical warehouse issues, safety stock and a one-month lead time. Historical issues served as gross requirements because production schedules and material coefficients were unavailable. The six-month usage was 1,959 kg for N-108 and 2,631 kg for L-107. SES gave the lower forecast error for N-108 and predicted 247.26 kg for July. MA-3 gave the lower error for L-107 and predicted 422.33 kg. The operational EOQ lots were 724 and 839 kg, and safety stocks were 120 and 214 kg, respectively. N-108 required no purchases, whereas POQ called for three L-107 receipts totaling 1,917 kg. Combined six-month inventory costs were Rp5,018,943 under POQ, Rp5,280,702 under LFL and Rp5,466,062 under EOQ. POQ retained the lowest cost in all twelve sensitivity scenarios. The results support a two-month ordering interval for L-107 within the study horizon. The modeled reduction of 54.44% relative to reconstructed warehouse practice depends on the assumed order counts and allocated holding cost.

Zitieren

APA

Aini, A. N., Ismiyah, E., & Negoro, Y. P. (2026). Control of Raw Material Inventories N-108 and L-107 Using the Material Requirements Planning Method. Jurnal Riset Ilmu Teknik, 4(3), 312-321. https://doi.org/10.59976/jurit.v4i3.421

Vancouver

Aini AN, Ismiyah E, Negoro YP. Control of Raw Material Inventories N-108 and L-107 Using the Material Requirements Planning Method. Jurnal Riset Ilmu Teknik. 2026;4(3):312-321. doi:10.59976/jurit.v4i3.421

BibTeX
@article{Aini2026,
  author = {Aini, Amelia Nur and Ismiyah, Elly and Negoro, Yanuar Pandu},
  title = {Control of Raw Material Inventories N-108 and L-107 Using the Material Requirements Planning Method},
  journal = {Jurnal Riset Ilmu Teknik},
  year = {2026},
  volume = {4},
  number = {3},
  pages = {312--321},
  doi = {10.59976/jurit.v4i3.421}
}
Kostenlos starten →