Control of Materials and Costs for Ready-Mix Concrete Using the Material Requirements Planning Method
Jurnal Multidisiplin Madani · 22.06.2026 · 6 (6)
DOI: 10.55927/mudima.v6i6.67 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Multidisiplin Madani, online erschienen am 22.06.2026. Verfasst von Trio Pendekar Lonan und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
One of the stages that must be completed before implementing a construction project is the planning stage. Planning for construction project material requirements is a critical component, as material resources constitute one of the largest components of total project costs, alongside equipment, labor, and work methods. This study aims to optimize the control of materials and ready-mix concrete costs in the Solo Raya Tourism Polytechnic construction project using the Material Requirements Planning (MRP) method. This method assists in efficient material requirements planning, minimizes waste, and improves overall project performance. Based on the results of material requirement calculations conducted for the Solo Raya Tourism Polytechnic construction project, it was found that the most appropriate material ordering method among several Lot Sizing methods is the Lot-for-Lot Method, which yields the lowest operational cost of Rp29,580,000. 00, compared to the Part Period Balancing Method at Rp38,238,205.00 and the Least Unit Cost Method at Rp56,442,800.00
Zitieren
APA
Lonan, T. P., Pangemanan, D. D. G., Waney, E. V. Y., & Mantiri, N. (2026). Control of Materials and Costs for Ready-Mix Concrete Using the Material Requirements Planning Method. Jurnal Multidisiplin Madani, 6(6). https://doi.org/10.55927/mudima.v6i6.67
Vancouver
Lonan TP, Pangemanan DDG, Waney EVY, Mantiri N. Control of Materials and Costs for Ready-Mix Concrete Using the Material Requirements Planning Method. Jurnal Multidisiplin Madani. 2026;6(6). doi:10.55927/mudima.v6i6.67
BibTeX
@article{Lonan2026,
author = {Lonan, Trio Pendekar and Pangemanan, Daisy D. G. and Waney, Estrellita V. Y. and Mantiri, Nixon},
title = {Control of Materials and Costs for Ready-Mix Concrete Using the Material Requirements Planning Method},
journal = {Jurnal Multidisiplin Madani},
year = {2026},
volume = {6},
number = {6},
doi = {10.55927/mudima.v6i6.67}
}
EUVIMED