EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A Collaborative Performance Evaluation Model for Construction Project Supervision in Gianyar Regency, Bali

I Dewa Gede Putra Hartawan K, I Made Oka Widyantara, Ngakan Ketut Acwin Dwijendra, Anak Agung Gde Agung Yana

International Journal of Integrated Science and Technology · 02.04.2026 · 4 (3) · 154-169

DOI: 10.59890/ijist.v4i3.305 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Integrated Science and Technology, online erschienen am 02.04.2026. Verfasst von I Dewa Gede Putra Hartawan K und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction project supervision plays a crucial role in ensuring project success in terms of quality, time, and cost performance. However, in local government contexts, supervision practices often face challenges due to weak coordination, overlapping roles, and limited stakeholder collaboration. This study aims to develop a performance evaluation model for construction project supervision based on multi-stakeholder collaboration. A mixed-method approach was employed, combining qualitative exploration through interviews and literature review with quantitative analysis using Structural Equation Modeling-Partial Least Squares (SEM-PLS). The findings indicate that role clarity, communication effectiveness, transparency, and trust significantly influence supervision performance. The proposed model integrates input, process, and output dimensions with collaboration as a key mediating factor. This study helps bridge the gap between technical supervision and governance-based approaches, offering a practical evaluation framework for local governments to enhance accountability, efficiency, and project performance. Keywords: Construction Supervision, Performance Evaluation, Multi-Stakeholder Collaboration, SEM-PLS, Local Government

Zitieren

APA

K, I. D. G. P. H., Widyantara, I. M. O., Dwijendra, N. K. A., & Yana, A. A. G. A. (2026). A Collaborative Performance Evaluation Model for Construction Project Supervision in Gianyar Regency, Bali. International Journal of Integrated Science and Technology, 4(3), 154-169. https://doi.org/10.59890/ijist.v4i3.305

Vancouver

K IDGPH, Widyantara IMO, Dwijendra NKA, Yana AAGA. A Collaborative Performance Evaluation Model for Construction Project Supervision in Gianyar Regency, Bali. International Journal of Integrated Science and Technology. 2026;4(3):154-169. doi:10.59890/ijist.v4i3.305

BibTeX
@article{K2026,
  author = {K, I Dewa Gede Putra Hartawan and Widyantara, I Made Oka and Dwijendra, Ngakan Ketut Acwin and Yana, Anak Agung Gde Agung},
  title = {A Collaborative Performance Evaluation Model for Construction Project Supervision in Gianyar Regency, Bali},
  journal = {International Journal of Integrated Science and Technology},
  year = {2026},
  volume = {4},
  number = {3},
  pages = {154--169},
  doi = {10.59890/ijist.v4i3.305}
}
Kostenlos starten →