EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Conflict Management in Building Construction Projects: Case Study in Gianyar Regency

I Dewa Made Agung Mearsana Puspa Adhitama, Dewa Ketut Sudarsana, Gusti Ayu Putu Candra Dharmayanti

Journal of Asian Multicultural Research for Economy and Management Study · 27.07.2026 · 7 (2) · 56-67

DOI: 10.47616/jamrems.v7i2.734 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Asian Multicultural Research for Economy and Management Study, online erschienen am 27.07.2026. Verfasst von I Dewa Made Agung Mearsana Puspa Adhitama und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Conflict is a common issue in construction projects that leads to project delays, increased costs, losses, decreased productivity, and strained relationships among project stakeholders. The construction sector consistently ranks among the top two to four largest contributors to the local economy of Gianyar from 2020 to 2024. Given these facts, the researchers are interested in analyzing the impactful factors causing conflicts in building construction projects in Gianyar Regency, Bali. Additionally, this study aims to provide recommendations on appropriate conflict modes to prevent conflicts from escalating into legal disputes. Data collection began with a literature review and field observations. The data were then tested using questionnaire method. The sample size was determined using Cochran’s sampling size method, resulting in 68 respondents. The data analysis utilizing the Relative Importance Index to identify the impactful factors causing conflicts. Meanwhile, recommendations for conflict modes were formulated based on expert interviews within the framework of the Thomas-Kilmann Conflict Mode Instrument. The study results indicate that the impactful conflict factors, among respondents, include: incomplete contract documents; unapproved claims for additional costs; poor communication among project stakeholders; unclear boundaries between the project site and land owned by indigenous communities; incorrect instructions given to the project field team; and incomplete working drawings and/or technical specifications. The study’s conclusions indicate that the recommended conflict modes primarily involve the “collaborating” mode. Only the factors of incorrect instructions given to the project field team and incomplete working drawings and/or technical specifications are recommended to use the “competing” mode.

Zitieren

APA

Adhitama, I. D. M. A. M. P., Sudarsana, D. K., & Dharmayanti, G. A. P. C. (2026). Conflict Management in Building Construction Projects: Case Study in Gianyar Regency. Journal of Asian Multicultural Research for Economy and Management Study, 7(2), 56-67. https://doi.org/10.47616/jamrems.v7i2.734

Vancouver

Adhitama IDMAMP, Sudarsana DK, Dharmayanti GAPC. Conflict Management in Building Construction Projects: Case Study in Gianyar Regency. Journal of Asian Multicultural Research for Economy and Management Study. 2026;7(2):56-67. doi:10.47616/jamrems.v7i2.734

BibTeX
@article{Adhitama2026,
  author = {Adhitama, I Dewa Made Agung Mearsana Puspa and Sudarsana, Dewa Ketut and Dharmayanti, Gusti Ayu Putu Candra},
  title = {Conflict Management in Building Construction Projects: Case Study in Gianyar Regency},
  journal = {Journal of Asian Multicultural Research for Economy and Management Study},
  year = {2026},
  volume = {7},
  number = {2},
  pages = {56--67},
  doi = {10.47616/jamrems.v7i2.734}
}
Kostenlos starten →