Evaluation Of Time Control Of Drainage Channel Project Using Earned Value Method (Case Study: Rehabilitation of Drainage Channels in Ngronggo Village, Kediri City)

Mukhamad Roichuddin, Olvi Pamadya Utaya Kusuma, Susilowati Susilowati, Monica Dewi

International Journal of Health Engineering and Technology · 02.07.2026 · 5 (2)

DOI: 10.55227/ijhet.v5i2.890 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Health Engineering and Technology, online erschienen am 02.07.2026. Verfasst von Mukhamad Roichuddin und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The success of a construction project is influenced by the management of three main components: cost, time, and quality. Time control is an important aspect so that project implementation can run according to the planned schedule. This study aims to evaluate the time performance of the Drainage Channel Rehabilitation Project in Ngronggo Village, Kediri City using the Earned Value method. The Earned Value method is used to analyze project performance by comparing the planned schedule with the work progress that has been achieved during project implementation. The parameters used in this study include the Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Schedule Variance (SV), and Schedule Performance Index (SPI). The results of the analysis show that the Schedule Variance (SV) value is negative, indicating that the project implementation has been delayed compared to the planned schedule. In addition, the Schedule Performance Index (SPI) value obtained is less than 1 (SPI

Zitieren

APA

Roichuddin, M., Kusuma, O. P. U., Susilowati, S., & Dewi, M. (2026). Evaluation Of Time Control Of Drainage Channel Project Using Earned Value Method (Case Study: Rehabilitation of Drainage Channels in Ngronggo Village, Kediri City). International Journal of Health Engineering and Technology, 5(2). https://doi.org/10.55227/ijhet.v5i2.890

Vancouver

Roichuddin M, Kusuma OPU, Susilowati S, Dewi M. Evaluation Of Time Control Of Drainage Channel Project Using Earned Value Method (Case Study: Rehabilitation of Drainage Channels in Ngronggo Village, Kediri City). International Journal of Health Engineering and Technology. 2026;5(2). doi:10.55227/ijhet.v5i2.890

BibTeX
@article{Roichuddin2026,
  author = {Roichuddin, Mukhamad and Kusuma, Olvi Pamadya Utaya and Susilowati, Susilowati and Dewi, Monica},
  title = {Evaluation Of Time Control Of Drainage Channel Project Using Earned Value Method (Case Study: Rehabilitation of Drainage Channels in Ngronggo Village, Kediri City)},
  journal = {International Journal of Health Engineering and Technology},
  year = {2026},
  volume = {5},
  number = {2},
  doi = {10.55227/ijhet.v5i2.890}
}
Kostenlos starten →