Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method

Putri Pinuji, Putri Anggi Permata Suwandi, Mohammad Debby Rizani

International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) · 25.04.2025 · 6 (1)

DOI: 10.26877/ijosbie.v6i1.20122 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE), online erschienen am 25.04.2025. Verfasst von Putri Pinuji und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In the Neucentrix renovation project, an addendum caused an extension. This study analyzes the weekly performance of the 2023 Neucentrix Pugeran Yogyakarta Project in terms of cost and time using the Earned Value method. The data analyzed using the Earned Value method using ACWP, BCWS, and BCWP indicators. From these indicators, CV, SV, CPI, SPI, EAS and EAC values are obtained. The analysis reveals cost savings from the first to the seventeenth week, with initial acceleration in the first four weeks followed by delays from weeks five to seventeen. The project is expected to take 19 weeks to complete, with a final estimated cost of IDR 2,294,673,540.

Zitieren

APA

Pinuji, P., Suwandi, P. A. P., & Rizani, M. D. (2025). Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method. International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE), 6(1). https://doi.org/10.26877/ijosbie.v6i1.20122

Vancouver

Pinuji P, Suwandi PAP, Rizani MD. Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method. International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE). 2025;6(1). doi:10.26877/ijosbie.v6i1.20122

BibTeX
@article{Pinuji2025,
  author = {Pinuji, Putri and Suwandi, Putri Anggi Permata and Rizani, Mohammad Debby},
  title = {Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method},
  journal = {International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)},
  year = {2025},
  volume = {6},
  number = {1},
  doi = {10.26877/ijosbie.v6i1.20122}
}
Kostenlos starten →