Schedule Preparation and Earned Value Management Analysis for High-Rise Residential Projects
International Journal of Scientific Research in Engineering and Management · 2026-06 · 10 (6)
DOI: 10.55041/ijsrem65193 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Scientific Research in Engineering and Management, 2026-06. Verfasst von Mohammad Abdul Hamid Shaikh Mohammad Abdul Hamid Shaikh.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Shaikh, M. A. H. S. M. A. H. (2026). Schedule Preparation and Earned Value Management Analysis for High-Rise Residential Projects. International Journal of Scientific Research in Engineering and Management, 10(6). https://doi.org/10.55041/ijsrem65193
Vancouver
Shaikh MAHSMAH. Schedule Preparation and Earned Value Management Analysis for High-Rise Residential Projects. International Journal of Scientific Research in Engineering and Management. 2026;10(6). doi:10.55041/ijsrem65193
BibTeX
@article{Shaikh2026,
author = {Shaikh, Mohammad Abdul Hamid Shaikh Mohammad Abdul Hamid},
title = {Schedule Preparation and Earned Value Management Analysis for High-Rise Residential Projects},
journal = {International Journal of Scientific Research in Engineering and Management},
year = {2026},
volume = {10},
number = {6},
doi = {10.55041/ijsrem65193}
}
EUVIMED