Comparative Analysis of Project Completion Forecasting Using Earned Value Management, Earned Schedule, and Program Evaluation and Review Technique

Kevin Ardian Krisanto, Mega Waty

JURNAL TEKNIK SIPIL CENDEKIA (JTSC) · 31.07.2026 · 7 (3) · 612-621

DOI: 10.51988/jtsc.v7i3.607 ↗

Kurz gefasst

Fachartikel in der Zeitschrift JURNAL TEKNIK SIPIL CENDEKIA (JTSC), online erschienen am 31.07.2026. Verfasst von Kevin Ardian Krisanto und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study evaluates schedule performance and forecasts the completion time of a restaurant construction project in the PIK 2 area by integrating Earned Value Management (EVM), Earned Schedule (ES), and the Program Evaluation and Review Technique (PERT). Unlike previous studies that apply these methods separately or through pairwise comparisons, this study integrates deterministic performance evaluation and probabilistic schedule forecasting to provide a comprehensive framework for project control. The project was evaluated at week 13 of a planned 37-week duration. EVM produced a Schedule Variance (SV) of ?Rp1,051,310,568 and a Schedule Performance Index (SPI) of 0.774, forecasting completion at week 48. ES generated a Time Variance (SV(t)) of ?4.44 weeks and an SPI(t) of 0.659, projecting completion at week 56. PERT estimated an expected project duration of 122.67 days and forecast completion at week 42 without acceleration and week 40 with acceleration at a 95% confidence level. The findings demonstrate that integrating EVM, ES, and PERT provides complementary insights for monitoring project performance, quantifying schedule uncertainty, and improving completion forecasting.

Zitieren

APA

Krisanto, K. A., & Waty, M. (2026). Comparative Analysis of Project Completion Forecasting Using Earned Value Management, Earned Schedule, and Program Evaluation and Review Technique. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 7(3), 612-621. https://doi.org/10.51988/jtsc.v7i3.607

Vancouver

Krisanto KA, Waty M. Comparative Analysis of Project Completion Forecasting Using Earned Value Management, Earned Schedule, and Program Evaluation and Review Technique. JURNAL TEKNIK SIPIL CENDEKIA (JTSC). 2026;7(3):612-621. doi:10.51988/jtsc.v7i3.607

BibTeX
@article{Krisanto2026,
  author = {Krisanto, Kevin Ardian and Waty, Mega},
  title = {Comparative Analysis of Project Completion Forecasting Using Earned Value Management, Earned Schedule, and Program Evaluation and Review Technique},
  journal = {JURNAL TEKNIK SIPIL CENDEKIA (JTSC)},
  year = {2026},
  volume = {7},
  number = {3},
  pages = {612--621},
  doi = {10.51988/jtsc.v7i3.607}
}
Kostenlos starten →