PLANNING, SCHEDULING, AND ESTIMATION OF G+2 RESIDENTAL BUILDING USING AUTOCAD AND PRIMAVERA
INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT · 13.04.2026 · 10 (04) · 1-9
DOI: 10.55041/ijsrem60056 ↗Kurz gefasst
Fachartikel in der Zeitschrift INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT, online erschienen am 13.04.2026. Verfasst von MD. BASHEER und 4 weiteren Autor:innen.
Abstract (Originalsprache)
Planning, Scheduling and estimation are essential for the successful completion of any construction project. This study presents the “planning, scheduling, and estimation of a G+2 residential building using AutoCAD and Primavera P6”. AutoCAD was used to prepare the building drawings such as floor Plans, Elevations, and structural layouts which formed the basis for quantity take-off and cost estimation. The quantities of materials and labour were calculated to prepare an approximate project estimate and Bill of Quantities (BOQ). Primavera P6 was then used to organize construction activities, assign durations, develop the project schedule, and identify the critical path. This helpful in effective time management, resource planning, and monitoring of project progress. The study shows that the integration of AutoCAD and Primavera improves accuracy, coordination, and efficiency in residential building construction. It also helps in completing the project within the planned time and estimated cost. Keywords: G+2 residential building, planning, scheduling, estimation, AutoCAD, Primavera P6.
Zitieren
APA
BASHEER, M., NAIDU, G., LOHITH, K., KRISHNA, S., & KARTHIK, V. (2026). PLANNING, SCHEDULING, AND ESTIMATION OF G+2 RESIDENTAL BUILDING USING AUTOCAD AND PRIMAVERA. INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT, 10(04), 1-9. https://doi.org/10.55041/ijsrem60056
Vancouver
BASHEER M, NAIDU G, LOHITH K, KRISHNA S, KARTHIK V. PLANNING, SCHEDULING, AND ESTIMATION OF G+2 RESIDENTAL BUILDING USING AUTOCAD AND PRIMAVERA. INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT. 2026;10(04):1-9. doi:10.55041/ijsrem60056
BibTeX
@article{BASHEER2026,
author = {BASHEER, MD. and NAIDU, G.TIRUPATHI. and LOHITH, K. and KRISHNA, S.HARI and KARTHIK, V.},
title = {PLANNING, SCHEDULING, AND ESTIMATION OF G+2 RESIDENTAL BUILDING USING AUTOCAD AND PRIMAVERA},
journal = {INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT},
year = {2026},
volume = {10},
number = {04},
pages = {1--9},
doi = {10.55041/ijsrem60056}
}
EUVIMED