Project Monitoring and Scheduling of Water Supply Project Using Primavera P6
International Journal of Scientific Research in Civil Engineering · 18.01.2023 · 7 (1) · 60-71
DOI: 10.32628/ijsrce22718 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Scientific Research in Civil Engineering, online erschienen am 18.01.2023. Verfasst von Ravi Patel und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Water is of fundamental importance for human life and plays an important role in many biological and chemical systems. Only 0.3% of the water resources in the world are usable.Scarcity of water has become widespread all over the world. Current methods for water scarcity assessment are mainly based on water quantity and seldom consider water quality. Population growth and urban development aspect dramatically alter natural watershed ecosystem structure and functions and stress water resources. The demand of time is review water quantity and water quality issues, as well as water supply challenges in an urban environment.So that more than a billion people in the developing world lack safe drinking water. About three billion people live without access to adequate sanitation systems necessary for reducing exposure to water-related diseases.Water is a valuable fundamental asset for life. Availability of sufficient water resource in any region effects socio economic development as well as better quality of life. Lack of water resource is determinant the poor quality of life. This research is based on secondary as well as primary data. This investigation highlighted the status of water resource and supply system in the Bhopal city and investigation of scheduling and resource allocation of water supply using Primavera p6. This research find out the spatial and temporal distribution of water supply system via narmada water supply as well as quality and quantity. Research also analysis the issues and challenges about water resource and satisfaction level of Bhopal city.
Zitieren
APA
Patel, R., & Nema, A. (2023). Project Monitoring and Scheduling of Water Supply Project Using Primavera P6. International Journal of Scientific Research in Civil Engineering, 7(1), 60-71. https://doi.org/10.32628/ijsrce22718
Vancouver
Patel R, Nema A. Project Monitoring and Scheduling of Water Supply Project Using Primavera P6. International Journal of Scientific Research in Civil Engineering. 2023;7(1):60-71. doi:10.32628/ijsrce22718
BibTeX
@article{Patel2023,
author = {Patel, Ravi and Nema, Anudeep},
title = {Project Monitoring and Scheduling of Water Supply Project Using Primavera P6},
journal = {International Journal of Scientific Research in Civil Engineering},
year = {2023},
volume = {7},
number = {1},
pages = {60--71},
doi = {10.32628/ijsrce22718}
}
EUVIMED