EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach

Bahman Shojaei, Heidar Dashti Naserabadi, Mohammad Javad Taheri Amiri

Qubahan Academic Journal · 27.09.2024 · 4 (3) · 861-881

DOI: 10.48161/qaj.v4n3a1027 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Qubahan Academic Journal, online erschienen am 27.09.2024. Verfasst von Bahman Shojaei und 2 weiteren Autor:innen. Die Arbeit wurde bisher 8-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Effective allocation of human resources to project activities is crucial in optimizing project schedules and resource utilization. This paper addresses the challenge of competency-based workforce allocation in construction project scheduling by integrating multi-criteria decision-making with meta-heuristic optimization. A three-objective mathematical planning model aimed at minimizing project completion time, reducing implementation costs, and enhancing workforce competency is proposed. By leveraging expert opinions and multi-criteria decision-making techniques the relevant competency criteria are identified and prioritized. Our approach involves solving a sample problem precisely using GAMS software and developing two meta-heuristic algorithms—Non-Dominated Sorting Genetic Algorithm (NSGA-II) and Multi-Objective Particle Swarm Optimization (MOPSO). The algorithms' parameters were optimized using Taguchi design techniques to ensure robust performance. The effectiveness of our proposed methods is validated by comparing their results with exact solutions and conducting extensive tests on large-scale problems. The results demonstrate that both meta-heuristic algorithms effectively address the competency-based allocation challenge, with NSGA-II showing superior performance in achieving optimal solutions. This study highlights the potential of integrating competency-based approaches with advanced optimization techniques to enhance project management in construction.

Zitieren

APA

Shojaei, B., Naserabadi, H. D., & Amiri, M. J. T. (2024). Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach. Qubahan Academic Journal, 4(3), 861-881. https://doi.org/10.48161/qaj.v4n3a1027

Vancouver

Shojaei B, Naserabadi HD, Amiri MJT. Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach. Qubahan Academic Journal. 2024;4(3):861-881. doi:10.48161/qaj.v4n3a1027

BibTeX
@article{Shojaei2024,
  author = {Shojaei, Bahman and Naserabadi, Heidar Dashti and Amiri, Mohammad Javad Taheri},
  title = {Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach},
  journal = {Qubahan Academic Journal},
  year = {2024},
  volume = {4},
  number = {3},
  pages = {861--881},
  doi = {10.48161/qaj.v4n3a1027}
}
Kostenlos starten →