EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Stakeholder Management Strategies and Performance of Water Works Development Projects in Northern Kenya

Ibrahim Hassan Abdikarim, Noor Ismail Shale

Journal of Entrepreneurship and Project Management · 12.07.2026 · 11 (4) · 1-22

DOI: 10.47941/jepm.3860 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Entrepreneurship and Project Management, online erschienen am 12.07.2026. Verfasst von Ibrahim Hassan Abdikarim und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Purpose

This study sought to examine the influence of stakeholder management strategies on the performance of water works development projects in Northern Kenya. Specifically, the study assessed the effect of continuous stakeholder monitoring, and stakeholder expectation management on project performance. Methodology: The study adopted a descriptive research design. The target population comprised 87 water works development projects in Northern Kenya, with project managers serving as the unit of observation. A census approach was used to include all 87 project managers. Data was collected using a structured questionnaire with five-point Likert scale items. A pilot study was conducted in Kajiado County to test instrument validity and reliability, including assessment of content validity, construct validity, and internal consistency using Cronbach’s alpha.

Findings

The study also found that continuous stakeholder monitoring is essential for sustaining project performance throughout the project lifecycle. Further, the study found that stakeholder expectation management is the most influential stakeholder management strategy affecting project performance. Thus, Clear communication, transparency, effective grievance handling, and continuous clarification of stakeholder expectations foster stakeholder satisfaction, trust, and commitment to project objectives. Unique Contribution to Theory, Practice and Policy: The study therefore recommends that project implementing agencies establish structured stakeholder monitoring systems throughout the project lifecycle.

Zitieren

APA

Abdikarim, I. H., & Shale, N. I. (2026). Stakeholder Management Strategies and Performance of Water Works Development Projects in Northern Kenya. Journal of Entrepreneurship and Project Management, 11(4), 1-22. https://doi.org/10.47941/jepm.3860

Vancouver

Abdikarim IH, Shale NI. Stakeholder Management Strategies and Performance of Water Works Development Projects in Northern Kenya. Journal of Entrepreneurship and Project Management. 2026;11(4):1-22. doi:10.47941/jepm.3860

BibTeX
@article{Abdikarim2026,
  author = {Abdikarim, Ibrahim Hassan and Shale, Noor Ismail},
  title = {Stakeholder Management Strategies and Performance of Water Works Development Projects in Northern Kenya},
  journal = {Journal of Entrepreneurship and Project Management},
  year = {2026},
  volume = {11},
  number = {4},
  pages = {1--22},
  doi = {10.47941/jepm.3860}
}
Kostenlos starten →